California Stormwater Permit Search: NPDES & Local Records

California • Water Quality • Public Permit Records

California Stormwater Permit Search: Find NPDES Coverage, Reports & Local Requirements

Looking for a California construction or industrial stormwater permit? Start with the State Water Resources Control Board’s official SMARTS database. You can search public permit records by facility name, operator, county, address, or Waste Discharge Identification Number (WDID).

Independent research guide: CountyPermitSearch.org is not a government agency and does not issue permits or provide a live connection to state records. Searches and submissions take place on official government websites.
Quick answer

For statewide construction and industrial stormwater permits, use SMARTS Public Access. For broader federal NPDES compliance and enforcement information, use the EPA’s ECHO Facility Search. For grading, drainage, post-construction runoff, or municipal development requirements, also check the city or county responsible for the project address.

1. Where to Search California Stormwater Permits

California stormwater records are divided among statewide regulatory databases, federal compliance systems, and local government permit files. The right starting point depends on the permit you are trying to locate.

Statewide database

SMARTS

Best for searching stormwater general permit coverage, Notices of Intent, facility records, construction sites, and associated reports.

Open SMARTS public search ↗

Federal compliance records

EPA ECHO

Useful for researching federally tracked NPDES facility information, compliance history, and enforcement records when available.

Open EPA facility search ↗

State agency guidance

California Water Boards

Find the applicable construction, industrial, or municipal stormwater permit program and current regulatory guidance.

View official program information ↗

City and county records

Local public works and permitting offices

Check project-specific drainage plans, grading approvals, erosion-control inspections, and post-construction runoff requirements.

Use the official website of the jurisdiction where the property is located.

A statewide stormwater enrollment does not automatically replace a local grading permit, building permit, or land-development approval. Conversely, a city building permit does not establish that required state NPDES stormwater coverage has been obtained.

2. What California Stormwater Permit Records Can You Find?

The State Water Board operates the Stormwater Multiple Application and Report Tracking System, commonly called SMARTS. It supports electronic management of stormwater general permit registration documents and reporting information.

Depending on the permit program, the record, and public access restrictions, you may be able to locate:

  • Owner or operator name and facility or construction site information.
  • WDID or other application identification numbers.
  • Notice of Intent (NOI) records.
  • Application and coverage status information.
  • Permit-related submission or processing dates.
  • Stormwater annual reports and certain monitoring information.
  • Notice of Termination (NOT) information.
  • Relevant regional Water Board and county information.

Not every document is necessarily available as a downloadable public file. The visibility of attachments, inspection information, or historical records depends on the applicable program and database.

Understanding common stormwater record terms

Common abbreviations appearing in California stormwater records
TermMeaningWhy it matters
NPDESNational Pollutant Discharge Elimination SystemFederal Clean Water Act permitting framework for regulated pollutant discharges.
SMARTSStormwater Multiple Application and Report Tracking SystemCalifornia’s electronic system for stormwater general permit information.
WDIDWaste Discharge Identification NumberA useful identifier for locating the correct regulated site or facility.
NOINotice of IntentA registration document used to seek applicable general permit coverage.
SWPPPStorm Water Pollution Prevention PlanExplains site controls and practices for preventing stormwater pollution.
NOTNotice of TerminationUsed to request termination of coverage when applicable conditions are satisfied.
NECNo Exposure CertificationRelevant to qualifying industrial facilities seeking a conditional exclusion.
MS4Municipal Separate Storm Sewer SystemRelates to stormwater systems operated by regulated municipalities and other public entities.

3. How to Search Stormwater Permits in SMARTS

SMARTS offers public search tools that do not require you to be the owner of a facility. The public interface is especially useful when checking whether a construction project or industrial operation appears in California’s general permit records.

1

Open the public access menu

Go to the official SMARTS Public User Menu. The page includes a search for owners, operators, facilities, and sites, along with separate public reporting tools.

2

Choose the appropriate search

Select the owner/operator or facility/site search when looking for permit enrollment. Use the separate industrial, construction, or municipal report options when you need reporting data rather than basic permit identification.

3

Enter reliable search information

Start with a WDID if available. Otherwise, enter a facility name, operator name, address, city, or county. The public NOI search also provides filters such as application type, region, status, and application ID.

Use a small number of accurate search fields initially. Adding too many filters can unintentionally eliminate a relevant result.

4

Review matching records

Compare the operator, facility or site address, permit category, and identifying numbers. Similar company names can refer to different facilities, particularly when an operator has multiple locations.

5

Check coverage, dates, and documents

Review the status displayed in the record and any supporting submissions available through the interface. If you need to confirm whether coverage is presently effective, verify the status and its effective dates rather than relying only on the presence of an NOI.

6

Save the details needed for follow-up

Record the WDID, facility name, project address, applicable permit, and any relevant dates. These details help when contacting the Water Board or comparing local agency records.

Public database maintenance:

SMARTS notes that public reports have scheduled nightly maintenance from 8:00 p.m. to 9:00 p.m. If data is temporarily unavailable during that period, return to the official system after maintenance. Availability may also be affected by other technical interruptions.

Direct public search options

Search Notices of Intent

Search by owner/operator, facility or site, WDID, region, county, status, and other available filters.

Open official NOI search ↗

Search stormwater reports

Use reporting period, program type, region, report type, location, or WDID to narrow reporting records.

Open official report search ↗

4. How to Check NPDES Stormwater Permit Status

Finding a facility in SMARTS is not always the same as proving current permit coverage. An application, an existing enrollment, and a request to terminate coverage can represent different stages.

What to verify in a permit record

  • Identity: Does the permit record match the actual site address and operator?
  • Program: Is it the relevant construction or industrial stormwater permit?
  • Application status: Has the record progressed beyond an initial submission?
  • Coverage information: Is the facility covered for the period being researched?
  • Termination: Is there an associated NOT or other indication that coverage ended?
  • Reporting: Are required reports visible for the relevant period?

Actual status labels may differ among database functions. Interpret the displayed status using the applicable permit and official Water Board guidance rather than assuming every listed record has the same legal effect.

Search historical permit activity

For a former industrial operation or completed construction project, search the appropriate reporting period and look for previous application records or termination information. If an older project has no immediately visible match, ask the appropriate Regional Water Board whether historical records are available elsewhere.

Check compliance through EPA ECHO

The EPA’s Enforcement and Compliance History Online system provides a separate federal view of certain regulated facilities. Search by state, name, identification number, or other available criteria.

ECHO may help identify federally tracked compliance and enforcement information, but its records are not a substitute for confirming current California stormwater enrollment through SMARTS or the responsible Water Board.

5. California Stormwater Permit Types Explained

California uses different regulatory programs for construction sites, industrial facilities, and municipal storm sewer systems. Knowing the category prevents confusion when a permit does not appear in the expected search results.

Major California stormwater permit categories
ProgramTypical regulated activityStarting source
Construction General PermitQualifying construction and land-disturbance activity.SMARTS construction records and the State Water Board construction program.
Industrial General PermitCovered industrial operations with regulated stormwater discharges.SMARTS industrial records and the industrial program.
Municipal MS4 permitsRegulated municipal stormwater collection and discharge systems.State and Regional Water Board municipal stormwater program records.
Local development approvalsGrading, drainage, erosion control, and post-construction runoff management.The city or county having jurisdiction over the project.

Construction stormwater permits

California’s statewide Construction General Permit regulates stormwater associated with qualifying construction and land disturbance. Clearing, grading, excavation, and stockpiling can be included in construction activity.

Projects disturbing one acre or more generally require coverage. A smaller project can also require coverage if it is part of a larger common plan of development or sale that disturbs at least one acre in total.

The current statewide Construction General Permit is Order 2022-0057-DWQ, adopted on September 8, 2022, and effective September 1, 2023.

The Lake Tahoe Hydrologic Unit has separate regional construction stormwater permitting requirements. Projects in that area must be evaluated under the applicable Lahontan Regional Water Board permit rather than simply assuming statewide general permit coverage is appropriate.

Official Construction Stormwater Program

Review the applicable general permit, coverage requirements, training information, guidance, and SMARTS resources.

California construction stormwater rules ↗

Industrial stormwater permits

Industrial stormwater regulation applies to specified categories of industrial activity. Covered operations may include certain manufacturing facilities, recycling operations, transportation facilities with vehicle maintenance, landfills, and other activities listed in the Industrial General Permit.

The statewide Industrial General Permit is Order 2014-0057-DWQ, as amended in 2015 and 2018. The State Water Board explains that the permit has been administratively continued after its June 30, 2020 expiration while a replacement is pending.

Industrial applicability is not determined solely by whether a business has a warehouse or paved parking area. Industry classification, the facility’s actual activities, exposure conditions, and regulatory exclusions all matter.

Facilities claiming qualifying no-exposure conditions may need an appropriate No Exposure Certification. A separate Notice of Non-Applicability may be relevant under the circumstances allowed by the permit. Neither should be assumed without evaluating the applicable conditions.

Official Industrial Stormwater Program

Review current permit documents, regulated industrial categories, guidance, and reporting resources.

California industrial stormwater rules ↗

Municipal stormwater permits

Municipal stormwater permits regulate qualifying municipal separate storm sewer systems, including systems operated by certain cities, counties, transportation agencies, and other public entities.

MS4 requirements can address illicit discharges, public education, municipal operations, construction oversight, and stormwater controls for new development or redevelopment.

Municipal permits differ from individual construction-site enrollments. A property developer may have obligations under local MS4 implementation requirements even when a project does not independently trigger the statewide Construction General Permit.

6. Finding City and County Stormwater Permit Records

Local stormwater approvals usually follow the authority responsible for land development at the property address. In incorporated cities, that may be the city public works, engineering, planning, or building department. For unincorporated property, the county often handles relevant local development approvals.

Which local records should you request?

  • Grading permit applications and approvals.
  • Erosion and sediment control plans.
  • Storm drain connection approvals.
  • Drainage and hydrology reports submitted with development plans.
  • Post-construction stormwater treatment plans.
  • Inspection records, correction notices, and closeout information.
  • Maintenance agreements for permanent stormwater facilities.

The terminology differs among municipalities. A local government might use terms such as stormwater quality plan, stormwater management plan, low-impact development plan, drainage report, or best management practices plan.

Los Angeles area

Projects in the Los Angeles region may be affected by the Los Angeles Regional Water Quality Control Board’s stormwater programs and the applicable local municipal requirements. The City of Los Angeles, other incorporated cities, and unincorporated Los Angeles County do not share one universal development-permit database.

First establish the property’s jurisdiction, then search that government’s engineering, grading, or development services records. Statewide NPDES records can be checked separately through SMARTS.

San Francisco Bay Area

Municipal stormwater requirements in the Bay Area may be implemented through regional permit requirements and local government programs. A project may require local drainage review or post-construction runoff controls even though its construction disturbance falls below the statewide one-acre threshold.

Confirm the municipal authority and applicable regional requirements for the site instead of assuming county boundaries determine the controlling stormwater permit.

San Diego area

For development in the San Diego region, check the applicable local jurisdiction’s stormwater requirements and the San Diego Regional Water Quality Control Board’s regulatory information. Local development approvals and statewide construction general permit coverage may need to be researched separately.

Sacramento and Central Valley

Stormwater records may involve the appropriate Central Valley Regional Water Quality Control Board program together with city or county land-development requirements. Use the project address to identify the local permitting authority and SMARTS to investigate applicable statewide stormwater enrollments.

Important jurisdiction distinction

California’s nine Regional Water Quality Control Boards are organized around water-quality regions, not simply around county lines. A county-based search is useful for locating a site, but the relevant Regional Water Board must also be identified.

How to request a local stormwater record

Contact the local public works or development services office and provide the property’s street address, parcel number if known, project name, and approximate work dates. Ask specifically for stormwater, grading, drainage, and inspection records.

If records are not available through the online portal, ask the agency about its public-records request process under the California Public Records Act. A records request is different from an application for a new permit.

Readers researching local construction approvals can also consult the County Permit Search directory for general navigation guidance. Always confirm the final permit requirements through the responsible government agency.

7. Documents Commonly Associated With Stormwater Permits

Permit registration and compliance documents vary by program, project characteristics, and regulatory requirements. A construction site and an industrial facility should not be expected to submit the same package.

Stormwater documents and their typical purpose
DocumentTypical use
Notice of IntentRequests coverage under a qualifying general permit.
SWPPPIdentifies pollutant sources and site-specific measures for preventing stormwater contamination.
Site mapShows relevant site features, drainage patterns, activity areas, and control locations.
Monitoring recordsDocuments sampling or observations required by the applicable permit.
Annual reportReports applicable yearly compliance and monitoring information.
Notice of TerminationRequests termination of permit coverage when eligibility conditions are met.
Local drainage planSupports city or county review of runoff, drainage infrastructure, and site development.

What is a Storm Water Pollution Prevention Plan?

A SWPPP describes how a regulated site will identify potential sources of stormwater pollution and implement appropriate control measures. It can address erosion, sediment movement, materials handling, site inspections, spill prevention, and monitoring.

The applicable permit determines the required content, personnel qualifications, implementation measures, and reporting obligations.

What are BMPs?

Best Management Practices, or BMPs, are physical, operational, or procedural controls intended to reduce the discharge of pollutants. Examples can include inlet protection, stabilized entrances, sediment controls, good housekeeping, and covered material storage.

The suitable controls depend on site conditions and regulatory requirements. An example BMP is not automatically sufficient for every site.

Who prepares construction SWPPPs?

The 2022 California Construction General Permit includes requirements involving Qualified SWPPP Developers (QSDs) and Qualified SWPPP Practitioners (QSPs). Their duties and qualifications depend on the applicable permit provisions.

Construction operators should review the State Water Board’s current requirements before retaining a consultant or relying on an older SWPPP template.

8. How to Apply for California Stormwater Permit Coverage

Searching for existing records and applying for new coverage are separate activities. A person who only wants to confirm a facility’s permit usually needs the public database. A responsible operator seeking new coverage must follow the appropriate application process.

Before starting an application

  • Determine whether construction, industrial, municipal, or another regulatory program applies.
  • Identify the correct owner or legally responsible person.
  • Confirm the site location and Regional Water Board.
  • Review the current permit and any location-specific conditions.
  • Prepare required plans and supporting information.
  • Identify authorized professionals where required.
  • Confirm current fees and filing instructions from the Water Boards.

General application sequence

1

Determine applicable permit coverage

Evaluate the activities and site conditions against the current official permit requirements. Do not choose a program only because another business or nearby site uses it.

2

Prepare registration documents

Collect the required facility or project information, SWPPP and supporting documents, and other permit-specific materials.

3

Use the appropriate SMARTS process

Follow the official electronic filing workflow and establish the necessary authorized accounts or certifications.

4

Complete applicable payment and certification

Follow the instructions displayed by SMARTS and the current Water Board fee guidance. Fees are subject to change, and the amount depends on the applicable program and circumstances.

5

Verify the resulting coverage status

Keep the submission confirmation and review the status of the enrollment. Do not treat an unfinished application as proof that required permit coverage is effective.

6

Maintain compliance during operations

Implement permit-required controls, inspections, monitoring, reports, and updates. When operations or construction end, evaluate the applicable termination requirements.

How much does a California stormwater permit cost?

California stormwater permit fees are determined through official Water Board fee schedules and the applicable regulatory program. There is no single reliable flat fee that covers every industrial facility, construction project, and municipal operation.

Check the official fee information before submission. Also consider separate costs for professional SWPPP preparation, sampling, laboratory services, stormwater controls, and local permits when relevant.

How long does approval take?

The timeline depends on the permit category, completeness of registration, required certifications, payment processing, and whether additional review or correction is necessary. Do not rely on an unverified universal approval period.

For a time-sensitive construction start, confirm the exact conditions for obtaining effective coverage with the current permit and responsible Water Board.

9. Stormwater Permit Search Problems and Solutions

No record appears for a facility

Check alternate spellings, former operator names, street abbreviations, and nearby jurisdiction labels. Search the WDID where available. The operator’s mailing address may differ from the regulated site’s physical address.

If the facility should be covered but no record is found, contact the appropriate Water Board rather than concluding that it is operating unlawfully.

The permit status does not look current

Check the program type, displayed reporting dates, historical application records, and any termination information. If the database appears inconsistent, ask the relevant Water Board to clarify the official coverage status.

A permit appears in SMARTS but not in local records

The two systems serve different purposes. SMARTS manages statewide general permit information; local departments maintain their own grading, drainage, and development approvals. Search both systems independently.

An older construction permit number appears

California’s construction permit program has changed over time. Older records may refer to previous permit orders. Check the historical coverage period and the applicable current requirements rather than assuming an old permit number establishes present coverage.

A business has multiple locations

Verify the physical address of the actual regulated facility. A company’s corporate name alone may return several sites or historical records, and a permit associated with one address does not necessarily cover another.

You suspect an unpermitted industrial facility

The State Water Board provides reporting channels for potential stormwater non-filers and violations. Gather the facility’s correct location and activity details, and use the official reporting process. An absent search result alone is not conclusive evidence of a violation.

The public website is temporarily unavailable

Try again outside SMARTS maintenance hours. If the issue persists, use the Stormwater Program’s official support contact rather than submitting sensitive account information to a third-party permit website.

10. Common Real-World Stormwater Permit Searches

Scenario A: A contractor starts a multi-lot development

A contractor plans a project involving several parcels, with each individual work area disturbing less than one acre. The combined common plan of development may exceed the one-acre threshold.

Instead of assessing each lot in isolation, the responsible party should evaluate the entire common plan under the Construction General Permit. SMARTS is the appropriate starting point for researching construction stormwater enrollment.

Scenario B: A property buyer reviews an industrial site

A buyer wants to understand whether a former industrial facility held stormwater coverage. The search should begin with the physical address, former business names, and any known WDID.

SMARTS can help identify enrollment and reporting records, while EPA ECHO may provide related federal compliance history. Those records do not replace an environmental site assessment or professional evaluation of possible contamination.

Scenario C: A homeowner plans a small addition

A homeowner proposes a relatively small project that does not obviously meet the statewide construction stormwater threshold. A local grading, drainage, erosion-control, or post-construction stormwater requirement may still apply.

The homeowner should check the city or county building and public works departments, especially if the project changes drainage patterns, expands impervious surfaces, or involves substantial grading.

Scenario D: A business renews a local business license

California Senate Bill 205 created business-license-related requirements involving certain industrial stormwater-regulated businesses. Cities and counties may request information demonstrating required permit enrollment or an applicable exclusion.

An affected business should evaluate its industrial classification and consult the official Water Board guidance rather than assuming that every business license applicant needs an industrial stormwater permit.

Read the official SB 205 business-license guidance ↗

11. Frequently Asked Questions

1. Where can I search California stormwater permits online?

Use the California State Water Resources Control Board’s SMARTS Public User Menu to search statewide stormwater general permit information. EPA ECHO can provide additional federally tracked NPDES facility and compliance records.

2. Can I search a California stormwater permit by address?

Yes. SMARTS public search tools include site and address-related filters. Results depend on how the site was registered and what records are available. Searching by WDID or operator name can help when an address search is unsuccessful.

3. What is a WDID number?

A WDID is a Waste Discharge Identification Number used in California Water Board records. It can help identify the regulated site or facility when searching stormwater enrollment and reporting information.

4. How do I know whether a construction project needs an NPDES permit?

Construction activity disturbing one acre or more generally requires stormwater general permit coverage. Smaller work that is part of a larger common plan disturbing at least one acre may also require coverage. Special geographic and permit-specific provisions must be considered.

5. What is the current California Construction General Permit?

The statewide Construction General Permit is Order 2022-0057-DWQ, which became effective September 1, 2023. Separate regional permitting arrangements apply in certain areas, including the Lake Tahoe Hydrologic Unit.

6. Can I download stormwater annual reports?

SMARTS provides public report searches for stormwater programs, including industrial and construction records. The availability of a particular report or attachment depends on its reporting period, record type, and public-access settings.

7. Is a stormwater permit the same as a grading permit?

No. Statewide NPDES stormwater coverage addresses regulated discharges, while a local grading permit governs earthwork and associated local development requirements. Some projects require both, along with other approvals.

8. How can I find an industrial stormwater permit?

Search the SMARTS public database using the industrial program category, facility or operator name, location, or WDID. Confirm that the correct site and applicable industrial activity are identified.

9. What happens when a construction project is completed?

The operator must meet the applicable permit’s requirements for terminating coverage. A Notice of Termination may be required, and completion of building construction alone does not necessarily establish eligibility for termination.

10. Who should I contact if my stormwater record is missing or incorrect?

Start with the California State Water Board Stormwater Program or the appropriate Regional Water Quality Control Board. Provide the site address, operator name, WDID if available, and a description of the problem.

12. Official California Stormwater Permit Resources

The following government resources are the primary starting points for verifying stormwater permit coverage, current regulatory requirements, and available public records.

California SMARTS Public Access

Search stormwater owners, operators, construction sites, industrial facilities, Notices of Intent, and public reports.

Open official SMARTS portal ↗

State Water Board — Construction Stormwater

Official permit orders, statewide construction coverage guidance, and related resources.

View construction stormwater program ↗

State Water Board — Industrial Stormwater

Industrial General Permit information, amendments, reporting, and help resources.

View industrial stormwater program ↗

SMARTS Help and Reporting Resources

Public guidance, electronic reporting information, program resources, and assistance.

SMARTS resource center ↗

EPA Enforcement and Compliance History Online

Research federally tracked facilities, NPDES compliance information, and available enforcement history.

EPA ECHO facility search ↗

Official stormwater program contact

Agency: California State Water Resources Control Board — Stormwater Program

Email: stormwater@waterboards.ca.gov

Toll-free phone: 1-866-563-3107

These are the general stormwater program contact details published by the State Water Board. Questions about a particular site may need to be directed to the appropriate Regional Water Quality Control Board.

How to choose the right office

Stormwater records are mainly researched online, so a physical map is not necessary to complete most searches. For an in-person records request or agency visit, first identify the relevant regional or local authority through its official contact directory. Do not assume the statewide agency headquarters handles every local permit file.

13. What to Do Next

If you already have a WDID, start with SMARTS and confirm the matching site, program, and coverage status. If you only have a company name or project address, search the public owner/operator and facility records first.

For construction projects, determine whether the statewide land-disturbance threshold or common-plan provisions apply. For industrial facilities, assess the activities and applicable industry classification. For local grading or development projects, contact the city or county with jurisdiction over the property.

When the record is missing, contradictory, or legally significant, obtain clarification directly from the responsible Water Board or local permitting office before relying on the result.

California Stormwater Records: Research Checklist

Before completing your permit search, confirm these essentials:

  • The exact facility or construction site address.
  • The correct operator or owner.
  • The relevant construction, industrial, or municipal program.
  • The WDID and coverage dates, when available.
  • Any required local grading or drainage approvals.
  • The appropriate Regional Water Quality Control Board.

About this guide

CountyPermitSearch.org publishes independent informational guides that help readers locate government-maintained permit databases and understand common records-search procedures. This page does not issue coverage, approve stormwater plans, or determine legal compliance.

Regulatory notice: Stormwater permits, program requirements, fee schedules, and public database contents can change. The applicable permit orders and instructions issued by the responsible regulatory agency control. This article provides general research guidance and is not a substitute for regulatory or professional advice.

Source references: California State Water Resources Control Board Stormwater Program, SMARTS Public Access, Construction General Permit Order 2022-0057-DWQ, Industrial General Permit Order 2014-0057-DWQ as amended, and U.S. EPA ECHO.

Independent publisher: CountyPermitSearch.org | Explore permit research guides

County Permit Smart Tools

Find the Right Permit, Prepare Documents, Plan Inspections & Avoid Permit Mistakes

Use these quick permit tools to understand which permit may apply, how to search permit records, what documents to prepare, which inspections may happen, and which local department usually handles your issue.

Built for permit users Helpful for building permits, remodels, roofing, electrical, plumbing, fences, pools, decks, zoning, and inspection planning.
Educational guidance only Permit rules, fees, forms, inspections, and deadlines must be verified with the official county or city office.
Mobile friendly Designed for phones, tablets, and desktop screens without external scripts, jQuery, or extra plugins.

Permit Type Finder

Select your project type to see the likely permit category, common documents, possible inspections, and the office you may need to contact.

Commercial and rental projects may need extra review, contractor details, or inspections.
Result copied.

Permit Search Method Helper

Search portals work differently by county or city. Choose what information you have and this tool will suggest the best way to search permit records.

Use this to create simple search variations if needed.
Tips copied.

Permit Application Readiness Checklist

Use this checklist before applying online or visiting the building department. Missing documents are one of the most common reasons permit applications are delayed.

Tip: Save PDFs, drawings, contractor licence proof, emails, and receipts in one folder before applying. It makes resubmission and inspection scheduling easier.

Permit Inspection Stage Planner

Select your project type to see common inspection stages and what to prepare before requesting an inspection.

Plan copied.

Correct Department Finder

Select the issue and this tool will show the department that usually handles it. Local names may vary by county or city.

Select an option above to see the usual department.

Unpermitted Work Risk Checker

If work was already done without a permit, use this tool to understand the risk level and next steps before ignoring the issue.

Result copied.