Pembroke Pines Permit Search: Find Records, Check Status & Schedule Inspections
Search building permit history for a Pembroke Pines property, find an open or expired permit, follow an application through plan review, or start a new permit through the city’s official systems.
The correct search depends partly on when the permit was created. Recent applications use the Development HUB, while older records may require the city’s historical records system or a records request.
Independent information resource: CountyPermitSearch.org is not the City of Pembroke Pines Building Department and does not issue permits or maintain official records. All permit searches, submissions, fees, and inspection requests must be completed through the appropriate government system.
Swipe horizontally to browse the sections on smaller screens.
Which Pembroke Pines Permit Search System Should You Use?
Pembroke Pines maintains building permit information across systems covering different time periods. Starting with the correct record source makes it easier to locate construction history, identify an old open permit, or find a recently submitted application.
1992–August 2, 2009
Historical Anzio records
Use the city’s historical building records resources for older job and permit activity. Some archived records or open/expired permit histories may require a separate request.
Historical Permit Search ↗August 3, 2009–Present
Development HUB and related records
The city directs users to its newer record resources for permits after August 3, 2009. EnerGov became the city’s permitting software in April 2022.
Current Record Links ↗Important distinction: August 3, 2009 is the dividing date the city provides for historical permit searches. April 4, 2022 is the EnerGov software launch date. These dates describe different aspects of the city’s records and should not be treated as interchangeable.
What if the property does not appear?
First, confirm that the address is actually within Pembroke Pines city limits. A mailing address containing “Pembroke Pines” does not by itself prove that the city is the permitting authority for every parcel.
Next, try the other city record resource if the permit date is uncertain. If the record is still missing, contact the Building Department and ask about archived permit history or the Open/Expired Permit Records Search Request.
How to Search Pembroke Pines Permits by Address
An address search is useful when you do not know the permit number. Homebuyers can use it to investigate a previous roof replacement or addition, while owners can check whether a contractor’s project appears in city records.
-
Open the city’s permit record directory
Visit the official Building Department Information & Forms page. Locate the Building Permit Records section and select the historical or newer record source that covers your project.
-
Enter the property information
Use the full street address in the search interface. If available, try a shorter street number and street name when the complete address returns no result. The exact search filters depend on the selected city system.
-
Compare the matching records
Look at the job address, permit number, job type, application date, and available status fields. Make sure the record belongs to the correct property before drawing conclusions.
-
Open the relevant permit
Review the details offered by that system. These may include the permit description, contractor, review stage, inspection information, or record dates. Document availability varies across older and newer records.
-
Confirm the final outcome
Do not assume that a permit was successfully closed simply because it was issued. Look for final inspection approval or other applicable closeout evidence. Request official records if the public display is incomplete.
Search with a permit number, owner, or contractor
If you already have a permit number, use it before attempting multiple address variations. Exact identifiers help distinguish similar projects on the same property.
The city’s legacy building records search includes criteria such as job address, owner name, contractor, permit number, permit status, inspection status, and date ranges. Not every filter will necessarily be available in the newer Development HUB interface.
Homebuyer example: A seller says the home’s roof was replaced several years ago. Search the property for roofing permits, compare the record with the seller’s documentation, and check whether the required final inspection was approved. If the record is unclear, request confirmation from the city before treating the work as officially closed.
For broader research, our Broward County permit search guide explains how to approach county-level records and jurisdiction differences. County and city databases are not necessarily interchangeable.
Check Pembroke Pines Building Permit Application Status
Applicants can follow permit progress through the city’s Development HUB. The city also sends permit issuance notifications through the portal or by email. An application may require additional documents or corrected plans before approval.
| Stage | What it generally indicates | What to do |
|---|---|---|
| Submitted / Received | The application has entered the intake process. | Check for missing-document requests and confirmation of acceptance. |
| Under Review | Review staff are assessing the application and applicable plans. | Monitor reviewer comments and requests for corrections. |
| Corrections / Hold | Further action or documentation is required before processing can continue. | Read the actual comments and follow the city’s resubmittal instructions. |
| Approved / Issued | The permit has reached an approval or issuance stage; these are not always identical. | Confirm issuance and obtain the approved permit card and plans. |
| Finaled / Closed | The applicable closeout requirements have been recorded as complete. | Preserve final inspection or certificate documentation as appropriate. |
| Expired / Canceled | The permit is no longer active under its previous status. | Ask the city whether renewal, a new application, or other corrective action is necessary. |
The wording above explains general permit stages. Always rely on the actual status and comments displayed by the city’s system rather than assuming every permit uses the same status labels.
Permit issued? Download the approved documents
Pembroke Pines distinguishes between permits submitted online and those processed in person. For an online permit, the approved documents and permit card must be downloaded from the Development HUB. For an approved in-person permit, the city requires the applicant to pick up the approved documents in person.
Keep a printed permit card and the approved plans at the job site for inspections. A payment receipt or application confirmation is not a substitute for an issued permit.
Apply for a New Pembroke Pines Building Permit
The City of Pembroke Pines accepts building permit applications through the Development HUB and at the Building Department counter. Since April 25, 2022, ordinary building permit applications have not been accepted by email.
Online building permit application
-
Register in the Development HUB
Use the city’s application page to access the official portal. Applicants submitting online must first register as a contact in the system.
-
Identify the permit category
Select the appropriate project application and enter accurate property and applicant information. Roofing, fences, additions, windows, mechanical work, and electrical work can have different supporting requirements.
-
Prepare the application package
Use the current Broward County Uniform Building Permit Application and the appropriate city checklists, affidavits, and cover sheets. The city lists a revised uniform application dated March 9, 2026.
-
Upload signed documents correctly
Plans requiring professional signatures and seals must be digitally signed and sealed for online submission. Combine sheets for each applicable trade into separate PDF files: structural, mechanical, electrical, and plumbing.
-
Submit and monitor the review
Make sure required documents are included before submitting. The city warns that the portal closes further uploads until the review cycle has completed. Watch for review comments, payment instructions, and permit notifications.
Avoid a common upload mistake: Do not place all trade drawings in one undifferentiated PDF. Pembroke Pines instructs applicants to organize signed and sealed drawings separately by trade. Missing documents or improperly prepared PDFs can place an application on hold.
In-person application requirements
For counter submissions, the city requests the current original Broward County Uniform Building Permit Application, necessary affidavits and cover sheets, and two plan sets designated as the office copy and job copy. Plans requiring signatures and seals must be physically signed and sealed; digitally sealed plans are not accepted as substitutes for the in-person format.
HOA and condominium approval documents
The city’s Information & Forms page states that an HOA Affidavit of Awareness is required with every building permit submittal, even if the property does not belong to an HOA. Owners must also independently check their association’s rules where applicable.
For a property classified as 04 – Condominium in the Broward County Property Appraiser records, the city requires a condominium approval letter signed and notarized by a registered agent listed with Sunbiz, confirming the association is aware of the proposed work.
Correcting rejected plans
When the city issues plan review comments, prepare a narrative or response letter explaining the corrections and submit an updated, properly signed and sealed plan set.
For online revisions, the city requires the complete plan set for each affected trade, even when only one sheet has changed. A single revised sheet by itself will not satisfy that instruction.
Three failed review cycles: The city states that a hold is placed on an application after its third failed review cycle. A meeting involving the Building Department, contractor qualifier, and design professional of record is then required. Contact the Permit Supervisor using the official application instructions for the next step.
Common Pembroke Pines Permit Types and Requirements
Most structural construction and many building-system replacements require a permit. The city publishes project-specific checklists, so the exact document package should be determined from the relevant checklist rather than a general list alone.
| Project | Documents or issues to investigate | Permit resource |
|---|---|---|
| Roof replacement | Re-roof checklist, roofing specifications, required product approval and applicable hurricane-zone documents. | City Re-Roof Permit Checklist |
| Fence installation | Fence checklist, site information, applicable height/location restrictions and fence construction requirements. | City Fence Permit Checklist |
| Windows, doors, shutters | Window/door checklist, opening information, product approval documents and applicable installation details. | Windows / Doors / Shutters Checklist |
| Air-conditioning replacement | AC change-out checklist, equipment information and electrical or mechanical requirements. | AC Change-Out Permit Checklist |
| Water heater | Water-heater checklist and replacement data form where applicable. | Water Heater Permit Checklist |
| Pool or spa | Pool and spa checklist, safety requirements, drawings and applicable trade permits. | Swimming Pool & Spa Checklist |
| Addition or new building | Site survey, zoning review, signed and sealed construction plans, structural and trade requirements. | Addition or New Construction Checklist |
| Solar panels / EV charger | Electrical scope, equipment information, site or roof considerations, and any required engineering review. | Solar Panel / EV Charger Checklist |
All checklist names above refer to resources published on the official Pembroke Pines Information & Forms page. Select the specific checklist for the project you intend to perform.
Which improvements may not need a building permit?
The city’s Building Department identifies ordinary interior painting, exterior painting, and flooring replacement without structural alteration as examples of work that generally does not require a building permit.
These examples are not permission to undertake other work without approval. A bathroom remodel involving plumbing, for instance, has a different scope from painting a room. Contact the city for a project-specific determination.
Engineering permits are different
Projects involving drainage, excavation, fill, sidewalks, swales, road cuts, paving, water distribution or other work affecting easements and rights-of-way may require Engineering Division authorization.
Do not assume a building permit alone covers work in the public right-of-way. The city’s Engineering Permits page explains this separate review process.
Owner-builder permits and contractor licensing
Florida law provides limited circumstances under which qualifying property owners may act as their own contractor. That does not mean every homeowner project qualifies, or that licensed trade requirements can always be bypassed.
Review the city’s Property Owner Acting as Contractor Affidavit and ask the Building Department about eligibility before submitting. If hiring a contractor, confirm the business is properly licensed for the scope of work using the Florida Department of Business and Professional Regulation.
Schedule and Track Pembroke Pines Building Inspections
Building inspections allow the city to assess permitted work at required construction stages. Depending on the project, this can include structural, electrical, plumbing, mechanical, roofing, or final inspections.
Ways to schedule an inspection
The city lists phone scheduling through the Building Department, its website, and the Development HUB account as available methods. Have the permit number, trade or discipline, inspection type and project address ready.
Inspection request deadlines are channel-specific
Check the correct cutoff: The city’s current web inspection request form states that requests received by 3:00 p.m. will be scheduled for the following workday. A separate legacy contractor/owner-builder scheduling login displays a 5:00 p.m. cutoff. Because these are different interfaces, follow the deadline displayed for the method you are actually using and confirm with the Building Department if uncertain.
The city operates its normal Building Department business schedule Monday through Thursday, rather than assuming Friday is a regular inspection business day. Scheduling instructions may also vary around holidays, emergencies and special inspections.
Prepare for the inspector
- Confirm the permit is issued and the requested inspection is eligible to proceed.
- Identify the inspection type listed on the permit card.
- Keep the printed permit card and approved plans on-site.
- Make the work area and relevant equipment accessible.
- Do not conceal work that requires inspection before covering.
- Review any previously failed inspection comments before requesting reinspection.
What happens after an inspection fails?
Read the inspector’s actual deficiencies and make the required corrections. If the report refers to a technical interpretation or you cannot identify what needs to change, contact the assigned inspector or the responsible trade reviewer.
After correcting the work, follow the city’s scheduling instructions to request a new inspection. A failed inspection does not automatically mean the entire permit application must start over.
How do I find the inspector or daily time window?
Use the Building Department Inspections page and the Development HUB for the available daily timeframe and inspector details. An appointment request or confirmation does not necessarily guarantee an exact arrival time.
Pembroke Pines Permit Fees, Processing and Building Code
Where to find the 2026–2027 fee schedule
The city announced that its Building Department fee schedule for 2026–2027 became effective October 1, 2026. Use the latest published fee schedule for building permit costs and the appropriate certificate fees.
The total amount can depend on permit classification, project valuation, reviews and other applicable charges. A generic flat estimate should not be treated as the city’s official calculation.
Official source: Open Information & Forms, then find the Fee Schedule section. Confirm the effective schedule and any project-specific charges before submitting payment.
How long does permit approval take?
The Building Department processes new and approved applications in the order received. Actual timing depends on completeness, permit complexity, interdepartmental review, corrections and workload.
Do not rely on a general promise that every fence, roofing, or residential project will receive approval within a specific number of business days. Request an application-specific update if the review appears delayed.
Florida Building Code currently in effect
The city’s published construction guidance identifies the Florida Building Code, 8th Edition (2023), effective December 31, 2023, as the adopted code in use. The next edition is expected to take effect December 31, 2026. Confirm the actual effective code when filing or revising an application near a code transition.
Expired permits and renewal requests
Pembroke Pines publishes different renewal requirements based on how long a permit has been expired:
| Situation | Documents | Published renewal charge |
|---|---|---|
| Expired less than 90 days | Renewal/extension request, updated uniform application, updated Notice of Commencement. | 50% of original permit fee. |
| Expired more than 90 days | Renewal/extension request, updated uniform application, updated Notice of Commencement, and city-approved construction plans. | 100% of original permit fee. |
| First or second extension | Extension request and applicable extension fee. | Check current schedule. |
| Third extension | Request plus a signed and notarized explanation from the contractor qualifier; Building Official approval required. | Applicable fee after approval. |
These are the city’s published renewal guidelines, not a guarantee that every expired permit qualifies for automatic renewal. All applicable fees must be paid, and the city may require additional review based on the permit’s circumstances.
Permit Search Problems and How to Resolve Them
No permit appears for the property
Check the address formatting, record dates, and whether Pembroke Pines is the issuing jurisdiction. Try the historical records source when the project predates the current software. If neither system provides the information, ask the records clerk to investigate archived records.
The permit is open even though work was completed
Compare the recorded inspection history with the required inspections on the permit card. An open permit may need additional inspections, documentation or formal closeout. Ask the city what specifically remains outstanding instead of assuming that age alone closes the permit.
The portal will not let me upload more documents
The city states that an online application’s upload access closes after submission until the review cycle is completed. Check the application’s current status and follow the correction or resubmittal process rather than creating duplicate submissions.
My contractor says the permit was approved
Ask for the official permit number and issued permit card. Independently verify the record. An application receipt, preliminary review or payment confirmation does not necessarily establish that the city authorized construction.
I need an old open or expired permit report
Use the city’s Open/Expired Permit Records Search Request Form. For relevant records from the 1992–2009 period, the city directs users to submit the completed request to PinesPermits@cgasolutions.com.
A permit needs to be canceled
The city’s cancellation instructions require a Permit Cancellation Request Form submitted in person or by email. An inspector may conduct a site visit to verify whether work was performed. Fees may remain due if the application already underwent review.
The project crosses building and engineering requirements
Ask which divisions must approve the project. A driveway or site-drainage project, for example, may require review beyond the main building permit. Resolve those requirements before starting construction.
When contacting the city: Include the property address, permit or application number, contractor name if applicable, and one clear explanation of the issue. This helps staff route the question to the appropriate permit technician, reviewer, inspector or records clerk.
Pembroke Pines Building Department Address, Hours and Map
City of Pembroke Pines Building Department
Charles F. Dodge City Center601 City Center Way, 2nd Floor
Pembroke Pines, FL 33025
Building Department phone: 954-435-6502
Building Department email: PinesPermits@cgasolutions.com
Published office hours: Monday–Thursday, 7:30 a.m.–5:00 p.m.
Typical assistance: Permit intake, application questions, plan review follow-up, inspection issues, permitting records and in-person submissions.
Confirm current counter hours, holiday closures and whether an appointment is needed before visiting.
Map location: Charles F. Dodge City Center, 601 City Center Way, Pembroke Pines, FL 33025. The Building Department is on the second floor.
Engineering Division contact
For engineering construction permits involving items such as roads, sidewalks, drainage, swales or public rights-of-way, the city lists the Engineering Division at 8300 South Palm Drive, Pembroke Pines, FL 33025, phone 954-518-9040. Confirm the correct office before visiting for a specific project.
Frequently Asked Questions About Pembroke Pines Permits
1. How do I search Pembroke Pines building permits by address?
Open the city’s official Information & Forms page, locate Building Permit Records and select the appropriate historical or newer records source. Search by property information where supported, then inspect the matching permit details.
2. Is the Pembroke Pines Development HUB an official city portal?
Yes. The city identifies the Development HUB, powered by EnerGov, as its system for online permitting and related services. Access it from an official ppines.com page to avoid unofficial lookalike websites.
3. Can I check a permit without an application number?
Depending on the records system, you may be able to locate permits using a property address or other search criteria. If you cannot find the record, ask the Building Department for assistance with the available property details.
4. Where can I find Pembroke Pines permits from before 2009?
The city identifies the Anzio historical records period as 1992 through August 2, 2009. For open or expired permit histories from that period, use the city’s records request procedure when the online information is insufficient.
5. How do I know if a permit has passed final inspection?
Review the permit’s recorded inspection results and applicable closeout status. Look for the relevant final approval or certificate. If the record shows only that a permit was issued, contact the city before treating it as finalized.
6. Can homeowners apply for building permits themselves?
Some eligible property owners can apply under Florida’s owner-builder provisions, subject to legal conditions and project restrictions. Review the city’s owner-builder affidavit and confirm the requirements before assuming you qualify.
7. Do I need a Pembroke Pines permit to replace a fence?
Fence work is among the project types the city’s Building Department identifies as requiring a permit. Use the official Fence Permit Checklist to determine the applicable documents and construction requirements.
8. Are building permits required for new windows and doors?
The city lists window and door installation among activities that generally require permitting. Its forms library includes a specific Windows / Doors / Shutters checklist and supporting information.
9. What is the deadline for next-business-day inspections?
The city’s current Inspection Request Form specifies 3:00 p.m. for requests to be scheduled the following workday. Its separate legacy scheduling login displays 5:00 p.m. Follow the instructions for your chosen scheduling channel or verify the cutoff by calling the Building Department.
10. How long does Pembroke Pines permit approval take?
There is no single reliable processing time for all building permits. Review duration depends on project complexity, application completeness, review comments and workload. The city processes applications in the order received.
11. Can I submit a new building permit application by email?
No. The city stopped accepting ordinary building permit applications by email on April 25, 2022. Apply through the Development HUB or in person. Email remains available for certain other administrative purposes, including contractor documentation and designated records requests.
12. What should I do when a permit expires?
Read the city’s renewal/extension requirements and contact the Building Department. The required documents and applicable fees vary depending on how long the permit has been expired and the specific status of the project.
13. Do I need HOA approval as well as a city permit?
HOA approval may be necessary under the association’s rules. The city also requires an HOA Affidavit of Awareness with permit submissions, and certain condominium properties need an additional notarized association awareness letter.
14. Is a Broward County permit search the same as a Pembroke Pines city search?
No. Pembroke Pines has its own municipal Building Department and permitting systems. First determine which government has jurisdiction over the parcel and the particular work. County-level records may be relevant to some approvals but should not replace a city search.
15. Who can help if the online portal is not working?
Contact the Pembroke Pines Building Department at 954-435-6502. Provide the affected permit or application number, describe the error, and ask for assistance from the appropriate portal support staff or permit technician.
Official Pembroke Pines Permit Resources and Next Steps
Use the following city and state resources to complete a permit search, submit an application, investigate inspection records, or confirm the requirements for planned work.
Official permit record overview and historical search information.
Open City Permit Search ↗Permit history links, applications, renewal forms, project checklists, fee schedules, HOA rules and building code guidance.
Open Forms and Records ↗Official online and in-person application instructions, document preparation and resubmittal requirements.
Open Application Guide ↗Inspection scheduling methods, preparation, contact information and available timeframes.
Open Inspection Instructions ↗Engineering permits for drainage, paving, utilities, sidewalks and rights-of-way.
Open Engineering Permits ↗Verify the status and classification of a professional license before hiring a contractor.
Florida DBPR ↗Related Florida permit guides
If the property’s jurisdiction or issuing authority is uncertain, start with our Florida permit search directory. For a broader county perspective, see the Broward County building permit guide.
What should you do next?
If you are researching a completed project, find the correct historical permit record and verify its inspection and closeout history. If you are starting work, obtain the project-specific city checklist and confirm permit and zoning requirements before paying a contractor or beginning construction.
For unresolved cases, contact the city directly with your property address and available record number. Official records and determinations from the responsible department take precedence over general online guidance.