Arkansas Mobile Home Permit Search: Installation Permits & Inspections

Arkansas Manufactured Housing • Permit & Inspection Guide

Find Arkansas Mobile Home Installation Permits, Decals & Inspection Information

Setting up, moving, buying, or checking a manufactured home in Arkansas? Start with the Arkansas Manufactured Home Commission for state installation requirements and installer licensing, then contact the local planning or permitting authority for property-specific approvals.

Independent information guide: CountyPermitSearch.org does not issue manufactured-home permits, conduct inspections, or maintain Arkansas government records. Official decisions and records come from the responsible government agencies.
State authorityArkansas Manufactured Home Commission
Installation decal fee$10 per decal under state rules
Local approvalsVary by property and jurisdiction

Where Do You Search for an Arkansas Mobile Home Permit?

An Arkansas mobile home permit search begins by identifying which record you need. Arkansas has a state-level manufactured housing program, but zoning, placement, utility connections, and building-related approvals may involve a city or county government.

The Arkansas Manufactured Home Commission (AMHC) regulates manufactured-home installers and administers installation compliance requirements. Its licensed-entity search and installation decal reporting system serve different purposes. Neither should be confused with a universal public database of every property installation permit in Arkansas.

Checking an installer?

Use the commission’s license search to look up a company or individual by license number, name, city, or ZIP code.

Open license search ↗

Checking a home installation?

Ask the installer for the decal number and installation documentation. The commission can advise on its records and procedures; the local permitting office can address local approvals.

View decal reporting fields ↗

Important distinction: The AMHC decal report is a reporting form intended for installation information submitted to the agency. It is not presented as a public search of installation histories. Avoid submitting a duplicate report merely to look up an existing installation.

For a property you own or plan to purchase, the most useful evidence is often a combination of state installation documentation, local permits, inspection records, and the manufacturer’s identification information.

Which Permits and Approvals Apply to a Mobile Home?

The term mobile home permit can refer to several separate requirements. A manufactured-home installation decal, a zoning approval, a utility permit, and a final inspection record do not establish the same thing.

Common manufactured-home records and where to begin
Record or approvalPrimary purposeWhere to ask
Installation permit decal State installation reporting for covered new manufactured homes AMHC / licensed installer
Installer license Verifies state licensing of the person or business installing the home AMHC license search
Zoning or placement approval Determines whether the home is permitted at the proposed site City or county planning authority
Electrical, plumbing or utility permits Covers regulated site service connections and related work Applicable local or state authority and utility
Installation inspection record Documents an inspection and any findings or corrections AMHC or relevant local inspection office

Manufactured homes, mobile homes and modular homes

People often use these terms interchangeably, but the regulatory distinction matters. A modern manufactured home is generally built to federal HUD manufactured housing standards, while a modular home is normally built under applicable building-code requirements. An older mobile home may predate the federal manufactured housing standards that took effect in 1976.

Arkansas maintains separate regulatory provisions for manufactured homes and modular homes. Verify the classification from the home’s documentation before selecting an installer or requesting an approval.

Before purchasing land: A home may meet manufacturing and installation standards yet still be restricted by local zoning, subdivision rules, deed restrictions, or site conditions. Confirm placement permission for the exact parcel before committing to delivery or site preparation.

How to Find Arkansas Manufactured Home Permit and Installation Records

There is no single public search interface identified here that returns every manufactured-home installation decal, local permit, and inspection in Arkansas. The most reliable approach is to search each responsible record holder.

Search the Arkansas Manufactured Home Commission license roster

The commission’s licensing interface provides fields for a license number, last name, business name, city, and ZIP code. At least one search field must be supplied.

  1. Open the Arkansas Manufactured Home Commission License Search.
  2. Enter the installer or business name, or use the license number if available.
  3. Review the returned identifying and license information.
  4. Confirm that the listed entity matches the company performing the work.
  5. Contact the commission if a status, category, or search result is unclear.

An installer license search establishes information about the licensee. It does not, by itself, prove that a specific home was properly installed or that a local placement permit was issued.

Identify the manufactured home using its labels and documents

For a particular home, collect the information needed to distinguish it from other units. Useful identifiers can include:

  • Property address and city or county
  • Home manufacturer and model
  • Manufacturing year
  • Serial or vehicle identification number (VIN)
  • HUD certification label number, when applicable
  • AMHC installation decal number, when applicable
  • Installer’s name and license number
  • Approximate delivery and installation dates

Keep the HUD certification label number separate from the state installation decal number. They serve different identification and regulatory functions.

Request an existing installation or inspection record

If you need confirmation of an installation report or state inspection, contact AMHC with the identifying details and ask whether the agency maintains a responsive record and how it may be requested.

For a locally issued placement, electrical, or other site permit, give the city or county permitting office the parcel address and any known permit number. Depending on the local system, records may be searchable online or available through a staff-assisted records request.

For property buyers: Request the seller’s installation paperwork and any available local approvals. If the records are missing, ask the relevant office what its records establish before treating a home as fully approved for its current location.

Arkansas Mobile Home Installation Process: Step by Step

For a new or relocated manufactured home, planning should begin before transportation and setup. The order of approvals may differ by jurisdiction, but these checkpoints reduce the risk of an installation that cannot be completed or approved.

  1. Confirm the property’s zoning and placement rules

    Identify whether the site is inside city limits or in an unincorporated area. Ask the responsible planning office whether the manufactured home is allowed, whether age or size restrictions apply, and what setbacks, access, foundation, or site-plan requirements must be met.

    If the parcel is within a subdivision or planned development, separately check recorded restrictions and any applicable association requirements.

  2. Determine whether the home is new or previously installed

    Arkansas installation standards distinguish new homes from used homes. This matters because new manufactured homes are installed according to the manufacturer’s instructions, while used homes are subject to commission installation specifications.

  3. Select a properly licensed installer

    Verify the installer’s credentials with AMHC before signing a contract. Ask who is responsible for foundations, anchoring, utility coordination, required local permits, decal reporting, and inspection-related corrections.

  4. Arrange required local approvals and prepare the site

    Obtain the applicable zoning or placement authorization and coordinate grading, drainage, access, septic or sewer service, water supply, and electrical service. The exact permits depend on the jurisdiction and the proposed work.

  5. Complete delivery, support, anchoring, and assembly

    The installer must follow the applicable manufacturer’s instructions or commission installation standards. Multisection homes also require appropriate assembly and connections according to their installation documentation.

  6. Complete installation decal and reporting obligations

    For covered new manufactured-home installations, the licensed installer or installing retailer purchases and affixes the state installation decal and submits required installation reports. The Arkansas rules specify the decal’s position and applicable timing.

  7. Address inspections and retain documentation

    Coordinate any required inspections through the appropriate state or local authority. Retain the decal details, installer documentation, local approval numbers, utility signoffs, and any inspection or correction records.

The installer and homeowner should agree in writing on who will obtain each required approval. Do not assume that purchasing the home includes every zoning approval, utility connection, or local permit.

Arkansas Manufactured Home Installation and Anchoring Standards

Arkansas Code of Rules, 20 CAR § 911-501, establishes the governing distinction between installation standards for new and used manufactured homes.

New manufactured homes

New single-section and multisection manufactured homes must be installed according to the manufacturer’s installation instructions. Those instructions are essential to determine the acceptable foundation, support, anchoring, and assembly details for the particular home.

Used manufactured homes

Used single-section and multisection homes are subject to the Arkansas Manufactured Home Commission’s installation specifications. A previously installed home should not be assumed to qualify for identical support and anchoring arrangements at a new site.

Alternative support systems

The rules allow alternative installation methods or materials when their support-system performance meets or exceeds the applicable requirements relating to foundation stability and load-bearing capacity. This is not a general exemption from safety rules or permission to improvise an unsupported foundation.

Read 20 CAR § 911-501 — Installation Standards ↗ Official Arkansas rule covering new homes, used homes, and alternative support systems.

What should be checked during installation?

The specific checklist must be based on the home’s instructions and applicable rules. Areas commonly requiring careful technical review include:

  • Site grading and drainage around the home
  • Foundation and support capacity
  • Proper placement of piers or other supports
  • Anchoring and wind-resistance requirements
  • Leveling and structural alignment
  • Connections between sections of a multisection home
  • Utility connections and related clearances
  • Access and other work required by local authorities

These are planning and record-review topics, not substitute engineering specifications. Foundation dimensions, anchor locations, and other construction details must come from the applicable approved installation documents.

How Arkansas Mobile Home Installation Inspections Work

Arkansas operates a state manufactured-home installation compliance program. Under 20 CAR § 911-307, the commission provides for inspections of a percentage of initial installations of new manufactured homes on a random-sample basis.

This does not mean every home automatically receives the same state inspection. Additional inspections or approvals may be required by local authorities or may arise from licensing, complaints, or other compliance circumstances.

State installation compliance inspections

These focus on compliance with installation standards administered through the manufactured housing program.

Local site and utility inspections

Where required, local or other applicable authorities review work within their jurisdiction, such as permitted electrical connections or site improvements.

Inspections for initially licensed installers

Under 20 CAR § 911-204, an initial installer license becomes a full license only after commission personnel inspect at least three installations completed by that installer and find substantial compliance.

Installers holding initial licenses must notify the commission of each completed installation within three business days. This requirement concerns the installer licensing process and should not be confused with a universal homeowner inspection deadline.

How to confirm whether your home passed inspection

  1. Ask the installer whether a state inspection was conducted and request available records.
  2. Contact AMHC with the home location, installation date, installer name, and identifying numbers.
  3. Contact the local permit authority for any local inspection history.
  4. Request written confirmation of unresolved corrections where available.
  5. Keep copies of official records in your property file.

Do not infer approval from silence: The absence of an inspection entry in a particular online search does not prove that the installation passed, failed, or was exempt. Confirm the relevant inspection process directly with the authority responsible.

What if an installation defect is discovered?

Arkansas has a complaint and dispute-resolution process covering qualifying manufactured-home construction and installation defects. Under 20 CAR § 911-306, certain matters reported in writing within one year after the first installation fall within the rule’s stated process.

Once the commission forwards a complaint, the responsible parties may be asked to investigate. The commission may conduct an inspection to resolve disputed or unresolved issues and assign responsibility for corrective work.

Report suspected safety problems promptly. The applicable rule provides for corrective-action deadlines based on the commission’s findings, including more urgent action where a serious health or safety threat is determined.

Read Arkansas’s Manufactured Home Complaint and Inspection Rule ↗ Official procedures for consumer complaints, inspections, correction orders, and certain appeals.

Arkansas Mobile Home Permit Fees and Important Deadlines

The state’s installation permit decal fee is only one potential cost of setting up a manufactured home. Local placement permits, utility work, land preparation, transportation, and contractor services are separate expenses.

Selected amounts and deadlines stated in Arkansas manufactured-home rules
RequirementAmount or timingWho it concerns
Installation permit decal $10 per decal Licensed installer or installing retailer
Affix installation decal Within 10 days of delivery to the site Covered new manufactured-home installations
Monthly installation report By the 15th day of the following month Installers and installing retailers reporting new installations
Original installer license / annual renewal $250 under 20 CAR § 911-204 Installer license applicants and licensees
Installer recovery fund assessment $2,500 under 20 CAR § 911-204 Applicable installer license applicants
Local placement / construction approvals Jurisdiction-specific Applicant or other responsible party under local rules

The $250 licensing charge and $2,500 recovery fund assessment are not ordinary $250 and $2,500 permit charges imposed on every homeowner. They are part of the professional installer licensing framework.

How the decal reporting system works

The AMHC installation decal report requests the installer’s license number and company information, AMHC decal number, installation date, retailer details, HUD label information, and homeowner location information.

Because the submission contains identifying information, it should be completed by the responsible reporting party using accurate records and the agency’s instructions.

AMHC Installation Permit Decal Report ↗ Online reporting interface for installation permit decal information, including installer, home, and location details. Official State Rule: Inspections and Fee Structure ↗ Review 20 CAR § 911-307 for the state decal, reporting, and inspection framework.

Cost planning: Ask for separate written estimates covering home delivery, site work, foundation and anchoring, licensed installation, utility connections, local permit fees, and any required corrections. Published state decal fees are not a complete installation budget.

Why Local Mobile Home Permit Requirements Differ Across Arkansas

State manufactured housing rules do not automatically authorize installation on every parcel. A city’s zoning district, subdivision rules, road access, and utility infrastructure can determine whether the planned location is acceptable.

Inside municipal boundaries

If the property lies within an incorporated city, start with its planning, zoning, or building-permit office. Ask about manufactured-home placement, permitted zoning districts, minimum lot requirements, required site plans, setbacks, and utility approvals.

Outside municipal boundaries

For an unincorporated property, contact the county’s relevant planning or permitting office to determine what county-level rules apply. Do not assume that being outside a city eliminates septic, floodplain, access, or other applicable requirements.

Site conditions that deserve early attention

  • Whether manufactured housing is allowed on the parcel
  • Setbacks from property boundaries and roads
  • Driveway and delivery access
  • Floodplain or drainage restrictions
  • Septic approval or sewer availability
  • Potable water availability and connections
  • Electrical service and meter requirements
  • Recorded private land-use restrictions

The required office may also vary by the type of work. A local planning office may not issue electrical credentials or decide a utility company’s connection requirements.

How to locate the right local authority

Begin with the property’s actual address and parcel information, not just the nearest town’s name. Determine whether the property is incorporated, identify the relevant local government, and ask for the manufactured-home placement process.

For general guidance on finding local building and permit departments, visit the County Permit Search directory. Always follow through to the responsible government office for official decisions and records.

Moving a used home: Permission for an existing manufactured home at one address should not be treated as permission to relocate it to another property. Confirm destination zoning, transportation arrangements, installation standards, and any local approvals before scheduling the move.

What to Do When a Mobile Home Permit or Inspection Record Is Missing

The installer does not appear in the license search

Try the legal business name rather than a trade name, or search by license number. Confirm the spelling and location. If the result remains unclear, request verification from AMHC before authorizing installation work.

The seller cannot provide an installation decal number

First establish whether the home is new or used and when the installation occurred. The decal provisions specifically address covered new installations. Ask the seller and installer for supporting documents and contact the commission to understand what record may be available.

The county cannot find the permit

Check whether the property was within municipal jurisdiction when work occurred. Also ask whether the record would have been issued under an alternative application category, prior parcel identifier, or different responsible authority.

There is no inspection history online

Contact the authority directly rather than treating the absence of an online entry as a pass or failure. The state’s random-sample inspection framework and local inspection processes do not necessarily generate identical public search records.

The home has an installation defect

Document the condition, take clear photographs, preserve the installation agreement and communications, and notify the responsible party. For potential construction or installation violations, review the AMHC complaint process promptly because its rules include relevant reporting periods.

The site is not approved for a manufactured home

Ask the local planning authority for the specific rule or reason. Determine whether the issue relates to zoning classification, setbacks, private restrictions, floodplain standards, or other property conditions. Do not proceed based on an assumption that an installed or purchased home must be allowed on the parcel.

Documents contain different identification numbers

Compare the serial/VIN, HUD certification label, AMHC decal, installer license, and local permit number separately. A mismatch may be a clerical error, a different section of a multisection home, or a record requiring further review.

Useful request wording: “I am checking the installation history for a manufactured home at [property address]. I have the installer name, installation date, and available home identification numbers. Can you tell me which records your office holds and how I can request copies?”

Arkansas Manufactured Home Commission Contact and Office Location

The Arkansas Manufactured Home Commission is the appropriate state-level starting point for manufactured-home installer licensing, installation decals, commission inspection matters, and complaints within its authority.

Arkansas Manufactured Home Commission

Address: 900 West Capitol Avenue, Suite 400, Little Rock, AR 72201

Telephone: 501-324-9032

Email: AMHC@Arkansas.gov

Agency affiliation: Arkansas Department of Labor and Licensing

Contact the agency before visiting to confirm office access and whether your request can be handled by phone, email, or online.

Open office location in Google Maps ↗

The state office is not a substitute for a city or county permitting department. Contact the jurisdiction responsible for the property when you need local zoning or site permit records.

Arkansas Department of Labor and Licensing — Contact Information ↗ Official state department contact page and location information.

Arkansas Mobile Home Permit Search FAQs

1. Do I need a permit to install a mobile home in Arkansas?

Arkansas regulates manufactured-home installation, and covered new installations require the state installation permit decal. A city or county may also require zoning, placement, site, or utility approvals. The exact combination depends on the home, work, and location.

2. Can I search all Arkansas mobile home installation permits online?

No universal public search of every installation and local permit was identified for this guide. The AMHC has an installer license search and an installation decal reporting interface, while local permits may be held by individual jurisdictions. Contact the responsible office for property-specific records.

3. How do I verify a manufactured home installer in Arkansas?

Use the Arkansas Manufactured Home Commission’s online license search. Search by license number, name, business name, city, or ZIP code, then confirm that the result corresponds to the installer you intend to hire.

4. How much is the Arkansas installation permit decal?

Under 20 CAR § 911-307, the state installation decal fee is $10 per decal, paid to the commission by the installer. This is separate from professional licensing fees and any applicable local permits or installation costs.

5. When must a new manufactured home’s installation decal be attached?

Arkansas rules require licensed installers and installing retailers to affix the applicable decal within 10 days of delivery to the site, at the point where electrical power is connected to the home.

6. Does every manufactured home receive a state inspection?

Arkansas rules establish random-sample compliance inspections for a percentage of new initial installations. Other state inspections may occur under licensing or complaint procedures, and local inspections may separately apply. Do not assume that every installation receives an identical inspection.

7. Can I put a mobile home anywhere on my property in Arkansas?

No. State installation compliance does not override applicable zoning, setbacks, floodplain requirements, utility regulations, or enforceable private restrictions. Ask the local planning or permitting authority about the specific parcel before delivery.

8. What happens when I move a used mobile home to another Arkansas property?

A relocated used manufactured home is subject to applicable installation requirements for used homes. You should also check destination placement restrictions, transportation arrangements, utilities, and local approvals. Documentation from the former location does not automatically authorize the new installation.

9. How can I find an inspection record for a manufactured home I want to buy?

Ask the seller for available installation documents and identify the installer and home. Contact AMHC about possible state installation or inspection records, and contact the responsible city or county for local permit and inspection history. Use the home’s identifiers to help match records.

10. What should I do if my manufactured home was installed incorrectly?

Record the specific problem, preserve photographs and contracts, and contact the installer or other responsible party. Review the commission’s complaint procedures and reporting time limits. Serious safety concerns should be addressed promptly by qualified professionals and the responsible authority.

Official Arkansas Mobile Home Permit and Installation Resources

Use these official regulatory and agency resources when verifying requirements. Rules, fees, contacts, and administrative procedures can change, so confirm the current requirements before applying, purchasing installation decals, or undertaking work.

Arkansas Code of Rules — § 911-307 ↗ Installation permit decals, installation reporting, and sample compliance inspections. Arkansas Code of Rules — § 911-501 ↗ Manufactured-home installation standards for new and used homes. Arkansas Code of Rules — § 911-204 ↗ Installer licensing requirements, fees, and initial-license inspections. Arkansas Code of Rules — § 911-306 ↗ Complaint investigations, inspections, corrective actions, and dispute resolution. Arkansas Manufactured Home Commission — License Search ↗ State commission licensing interface for identifying relevant licensees. Arkansas Manufactured Home Commission — Decal Report ↗ Installation decal reporting form collecting license, decal, home, and owner location information.

What to verify before finalizing an installation

Check that the installer is properly licensed, that the selected home is allowed at the site, that the correct new- or used-home installation standard is followed, and that applicable reporting, local permits, and inspections have been addressed.

For an existing home, make the record search specific: collect the property address, available unit identifiers, installation date, decal information, and installer name before contacting an agency.

Next Steps for Your Arkansas Manufactured Home

County Permit Smart Tools

Find the Right Permit, Prepare Documents, Plan Inspections & Avoid Permit Mistakes

Use these quick permit tools to understand which permit may apply, how to search permit records, what documents to prepare, which inspections may happen, and which local department usually handles your issue.

Built for permit users Helpful for building permits, remodels, roofing, electrical, plumbing, fences, pools, decks, zoning, and inspection planning.
Educational guidance only Permit rules, fees, forms, inspections, and deadlines must be verified with the official county or city office.
Mobile friendly Designed for phones, tablets, and desktop screens without external scripts, jQuery, or extra plugins.

Permit Type Finder

Select your project type to see the likely permit category, common documents, possible inspections, and the office you may need to contact.

Commercial and rental projects may need extra review, contractor details, or inspections.
Result copied.

Permit Search Method Helper

Search portals work differently by county or city. Choose what information you have and this tool will suggest the best way to search permit records.

Use this to create simple search variations if needed.
Tips copied.

Permit Application Readiness Checklist

Use this checklist before applying online or visiting the building department. Missing documents are one of the most common reasons permit applications are delayed.

Tip: Save PDFs, drawings, contractor licence proof, emails, and receipts in one folder before applying. It makes resubmission and inspection scheduling easier.

Permit Inspection Stage Planner

Select your project type to see common inspection stages and what to prepare before requesting an inspection.

Plan copied.

Correct Department Finder

Select the issue and this tool will show the department that usually handles it. Local names may vary by county or city.

Select an option above to see the usual department.

Unpermitted Work Risk Checker

If work was already done without a permit, use this tool to understand the risk level and next steps before ignoring the issue.

Result copied.