Search Davie Building Permits, Check Status and Request Inspections
Looking up a building permit in Davie? Use the Town of Davie’s official eSuite portal to search records by street address or permit number. For a new application, use the separate Online Application Submittal (OAS) system introduced on January 12, 2026.
Important 2026 change: An older permit guide may tell you to apply for a new Davie permit directly in eSuite. That instruction is outdated. Starting January 12, 2026, the Town designated OAS as the required method for new Building Division permit submissions and service requests. eSuite remains useful for public searches, permit status and authorized inspection scheduling.
Confirm the current process on the official Building Division page ↗
How to Search Town of Davie Building Permits by Address
The Town of Davie provides a public permit search through eSuite, its permit information system. Residents, buyers, real estate professionals and contractors can use the public search without creating a contractor account.
The search screen includes three useful fields: Permit Type, Permit Number and Service Address. You do not need to fill in every field. Start with the identifier you already have.
Open the official search page
Use the Town’s eSuite public search link above. It opens the actual permit-record search, not a third-party property listing.
Enter the service address
Type the property street address. Include its street number and name. Where the portal offers matching address choices, select the correct property.
Review the permit results
The results can include permit numbers, application numbers, statuses and property addresses. Compare the address carefully, especially for parcels with multiple units or buildings.
Open the relevant permit
Choose the appropriate record to inspect additional details available in the system. Check the permit type, status and inspection history rather than relying only on a summary row.
Confirm what the record establishes
Look for evidence that the permit was issued, that required inspections passed and that any applicable completion or closeout process was satisfied. A permit appearing in search results is not, by itself, proof that the work passed final inspection.
Search by permit number instead
If you have an official permit number, use the Permit Number field. Davie specifically instructs users to enter the complete number, including its formatting, rather than a shortened portion.
For example, an official format shown in Town instructions is 2022-00008490. This is a format example, not a permit belonging to the reader.
Property search tip: When an address does not produce a match, check the street direction, road type, building/unit designation and spelling. Try the complete permit number if available. For older or missing records, contact the Building Division rather than assuming no permit exists.
How to Check Davie Permit Application and Inspection Status
Searching for a permit and checking its status use the same public record system. An applicant may also receive review information through ProjectDox, which serves a different purpose from eSuite.
eSuite
Best for searching permit records by address or permit number, reviewing permit status and viewing available inspection information.
ProjectDox
Used for electronic plan and document review. Applicants receive instructions or invitations as part of the Town’s processing workflow.
What common permit statuses mean
| Status | What to check |
|---|---|
| Under review or pending | A review or administrative step may still be outstanding. Look for comments, required corrections or notifications. |
| Pending payment | Confirm the Town’s actual invoice before paying. An automatically displayed amount may not be final. |
| Permit issued | The authorization has been issued. Check permit conditions and required inspections before beginning or continuing the relevant work. |
| Permit completed | Review the underlying inspection and closeout records for the specific work involved. |
| Expired or otherwise inactive | Ask the Town whether renewal, an extension or another corrective process is available before work continues. |
These explanations help you interpret common records; they are not an exhaustive official status-code directory. A review comment, payment issue or missing inspection can change what action is needed.
Checking a permit for a home purchase
If you are buying a Davie property, search for significant additions, reroofing, electrical upgrades, air-conditioning replacements and other work that may have required permits. Keep the permit numbers and statuses for discussion with your inspector, seller or closing professional.
A public permit search does not establish that every improvement was permitted, nor does it replace a property inspection or a formal records request. Records may be incomplete or stored across different systems.
How to Apply for a New Town of Davie Building Permit in 2026
Davie’s current application process starts in the Online Application Submittal (OAS) portal. This is a significant distinction for anyone following an older guide that directs all new applications to eSuite.
Determine the permit category
Identify whether the project involves building/structural, electrical, plumbing, mechanical, roofing or a combination of disciplines. A larger project may require multiple associated permits and reviews.
Prepare the required application
Use the current Town building permit application and project-specific checklist. Confirm the property address, scope of work, estimated construction value and applicant information.
Submit a request through OAS
Open OAS and follow the applicable Building Permit request instructions. Be accurate with the email address: it is important for receiving later document-upload and processing instructions.
Watch for the ProjectDox invitation
The Town explains that applicants receive an email inviting them to upload plans and documents through ProjectDox. Check the spam folder if the message does not appear.
Upload plans in the required format
Follow the Town’s file naming, document type and project checklist rules. Upload missing materials or corrected plans when requested. A successful initial request does not necessarily mean plan review has begun.
Respond to reviews and pay verified charges
Monitor the review process and respond to correction requests. The Town says applications with a job value of $100,000 or more require an application/drop-off fee before routing to review. Wait for official payment instructions where required.
Obtain the issued permit and follow conditions
After approval and payment processing, access the approved documents and permit information provided by the Town. Schedule the required inspections at the correct construction stages.
Paper and email submission warning: The Town states that its new OAS process replaces ordinary paper permit submissions and direct emails to individual employees. It separately describes limited in-person and legacy-paper-permit procedures. Follow the current Building Division instructions for your specific situation rather than assuming a mailed or emailed application will be accepted.
Owner-builder applications
Florida has owner-builder provisions, but they are not a blanket exemption from licensing, safety or permitting rules. Applicants using this route should review the Town’s Owner Builder Disclosure Statement and confirm whether their property and proposed work qualify.
The Town notes that when an owner-builder permit application is handled in person, the owner-builder must personally bring the application. Do not assume a contractor’s standard application procedure applies unchanged.
Find the Owner Builder Disclosure Statement and Building Permit Application ↗
Corrections and revisions
For applications handled through the newer system, request revisions through OAS and upload the required documents and revised plans through the resulting workflow.
For permits originally submitted on paper, Davie publishes a separate legacy procedure that may require a revision form and two sets of plans delivered to the Building Division. Verify the applicable process before submitting.
Documents to Prepare Before Applying for a Davie Permit
The documents required depend on the type of work, its location and whether the applicant is a licensed contractor or qualifying owner-builder. A roof replacement does not require the same plans as an addition, and commercial construction may involve additional professional design and agency reviews.
Practical pre-submission checklist
- Correct property address and owner information.
- Completed Town building permit application and applicable addendum.
- Accurate description and construction value of the work.
- Contractor license and applicant details, where applicable.
- Owner-builder disclosure, if applying under that provision.
- Current survey or acceptable survey documentation when required.
- Site plan showing proposed work, dimensions and setbacks when applicable.
- Construction drawings or signed/sealed plans where required.
- Product approvals, engineering information and discipline-specific documents when applicable.
- Notice of Commencement or other required recorded documents when applicable.
- Any required zoning, engineering, landscaping or floodplain information.
This is a planning checklist, not a substitute for the exact Town checklist associated with your permit type.
Official forms worth checking
Davie’s Building Forms directory contains the Building Permit Application, Addendum, Owner Builder Disclosure Statement, Revision/Shop Drawings materials, permit extension and renewal requests, Notice of Commencement and ProjectDox instructions.
Using the official forms directory is safer than downloading an old application from an unrelated website, especially after the January 2026 submission change.
Browse current Town of Davie building forms ↗
How to find your parcel or ownership information
The Broward County Property Appraiser provides property record information that may help confirm an owner name, folio/parcel identifier or situs address.
Property appraiser information is not a substitute for the Town’s permit records. Use each system for its intended purpose.
Common Building Permits: Roofing, Fences, Remodeling and More
Davie projects are reviewed based on their actual scope, applicable building codes and local land-development requirements. These examples help identify which questions to ask before submitting a permit.
| Project | What to check before applying |
|---|---|
| Roof replacement | Roof type, applicable product approvals, contractor details and any required roof assembly documentation. |
| Fence installation | Fence height, location, setbacks, property boundaries, easements and relevant zoning/engineering review. |
| Residential addition | Survey, site plan, structural drawings, building setbacks and associated electrical, plumbing or mechanical work. |
| Electrical upgrades | Scope of circuit or service work, equipment information and contractor licensing requirements. |
| Plumbing changes | Fixture locations, piping changes, equipment specifications and applicable inspections. |
| HVAC replacement | Equipment sizing/details, mechanical requirements, related electrical work and any required product documentation. |
| Swimming pool | Survey, pool plans, barriers, electrical work, setbacks and applicable engineering/zoning requirements. |
| Commercial alterations | Occupancy/use, accessibility, life safety, fire review and professionally prepared plans when required. |
Davie fence permits
A fence project can raise questions beyond construction materials. Its location relative to property lines, utility easements, drainage, roads and required setbacks can affect approval.
Start with the property’s survey and a clearly identified proposed fence location. Consult the Town’s applicable permit and engineering checklists, including its pool and fence information where relevant.
See Davie Engineering permit information and checklists ↗
Davie roofing permits
Roofing work often requires material specifications and applicable product approval information. A complete application should identify the work proposed and the contractor responsible where licensing is required.
The Town also publishes an important roofing-inspection safety instruction: an OSHA-approved ladder must be set up and secured to the roof on the inspection day so the inspector can access the work.
Do not assume every reroof qualifies for expedited review or a fixed processing time. Follow the specific roofing requirements given by the Building Division.
Check contractor licensing
Before hiring a contractor or relying on someone to obtain permits, verify licensing through Florida’s Department of Business and Professional Regulation (DBPR), as applicable to the trade.
Check that the business or individual details match and that the license category is appropriate for the proposed work. A permit status search alone is not a contractor license check.
Davie Building Permit Fees, Payments and Review Times
Permit fees depend on the project, construction value, disciplines involved and any applicable review charges or surcharges. A single flat price cannot accurately represent every Davie permit.
Where to find the official fee schedule
The Town provides a Building Permit Fee Schedule, including permit fees, plan review, inspections and other applicable charges. The published schedule identifies modifications effective October 1, 2025. Confirm whether a newer schedule or amendment applies before submitting payment.
Do not pay solely from the eSuite estimate
Davie specifically cautions applicants that amounts automatically shown in eSuite may change during processing. The Town sends an invoice with the actual payment instructions.
Depending on the available payment method, applicants may have options such as online card payment, telephone payment, check or ACH transfer. The Town states that payment processing can take one to three business days, after which the permit card, permit and receipt are made available in the approved ProjectDox folder.
For master permits and associated subpermits, verify payment sequencing and any outstanding charges with the Town.
How long does approval take?
The Town’s published FAQ says it generally attempts to review permit applications within 30 working days, depending on complexity and workload. That is not a guaranteed issuance date.
Corrections, incomplete submissions, additional disciplines and outside-agency approvals may affect the overall timeline. A project should not begin permit-required work simply because an application has been submitted.
How to Schedule and Check Davie Permit Inspections
Required inspections verify work at specified construction stages. The exact sequence depends on the project and permit conditions. Davie provides online and telephone scheduling options.
Online inspection request
The Town lists OAS as an inspection-request option. Registered contractors may also use eSuite for scheduling and reviewing inspections.
Automated phone scheduling
Call 954-797-1128 or 954-797-1129. You need the phone access code and inspection code from the permit package.
The Town notes these codes are on the inspection sheet, not the permit card.
Official inspection scheduling rules
4:30 p.m. cutoff: Inspection requests received before 4:30 p.m. are added to the next-business-day schedule. Requests received on Friday, Saturday, Sunday or a Town-observed holiday are shifted according to the Town’s published business-day procedure.
For example, a request received during a weekend may be treated as received on the following business day, with the inspection scheduled for the business day after that. Confirm the actual scheduled date rather than relying on your originally requested date.
Find your approximate inspection time
Check eSuite after 8:00 a.m. on the morning of the inspection for an approximate time window.
If you need to speak with an inspector, the Town directs callers to 954-797-1111 between 7:30 and 8:15 a.m. that morning.
Inspection cancellation warning
Under the Town’s policy effective November 1, 2025, inspections cannot be canceled after 8:30 a.m. through the ordinary process. A late attempted cancellation may result in additional fees.
If site conditions change, contact the Building Division as early as possible.
Prepare the job site before an inspection
- Confirm the permit and specific inspection requested.
- Ensure the applicable work is ready for inspection.
- Have required approved plans and permit documents available.
- Provide safe access to the relevant work area.
- Follow special access or safety instructions, including the roofing ladder requirement when applicable.
- Check the inspection result and respond to any corrections before requesting reinspection.
For a project involving rough-in work, do not cover elements that need inspection before the relevant inspection occurs.
Where to view inspection results
Use the eSuite permit record and enter the complete permit number or service address. Review the available inspection entries to identify the inspection stage and reported outcome.
Davie Permit Expiration, Renewal and Extensions
Permit issuance is not indefinite permission to leave a project inactive. Davie’s Building Division publishes expiration and renewal guidance tied to Broward County’s administrative provisions of the Florida Building Code.
The Town’s guidance states that an issued permit may become void if authorized work does not commence within 180 days, or if work is suspended or abandoned for 90 days after commencement. The Town also explains inspection inactivity in its permit-validity FAQ.
Actual expiration and renewal eligibility depend on the governing rules and the record. If a permit is approaching expiration or is already inactive, contact the Town before continuing construction.
What to do if your permit expired
- Look up the permit using its complete number.
- Check the last known status, inspection and issue dates.
- Review the Town’s Permit Renewal Request or Permit Extension Request form, as appropriate.
- Contact the Building Division if the correct procedure is unclear.
- Submit the required request through the Town’s current process and wait for its decision.
Renewal or extension is not automatic. Additional fees or other conditions may apply.
What to Do When a Davie Permit Search or Application Does Not Work
| Problem | Recommended next action |
|---|---|
| No permits found for the address | Check spelling, street direction and address selection. Try the full permit number or ask the Town about historical records. |
| Permit number not recognized | Enter the complete number with its original hyphenation and digits. |
| New application option missing in eSuite | Use the current OAS portal rather than treating eSuite as the new-application starting point. |
| No ProjectDox invitation received | Check email and spam folders, confirm the address supplied in OAS and contact the Building Division. |
| Plans returned for corrections | Read the relevant review comments, update all affected documents and follow the correction workflow. |
| Payment amount looks incorrect | Wait for or confirm the official Town invoice; do not assume eSuite’s displayed estimate is final. |
| Inspection not on schedule | Check the 4:30 p.m. cutoff, weekend/holiday processing and whether the request was complete. |
| Permit is expired | Ask about renewal or extension and review the official request forms before work proceeds. |
How to request historical or additional records
If eSuite does not show everything needed for a property transaction, insurance matter or compliance review, ask the Building Division whether another Town records system or formal records request is appropriate.
The Town’s Building Forms directory includes a Records Request Form. Describe the property address, relevant date range and type of document as precisely as possible.
City or county jurisdiction?
Davie is a town in Broward County. A property with a Davie mailing address should not automatically be assumed to fall under Town of Davie permitting jurisdiction.
Confirm the property’s actual municipal jurisdiction, particularly near boundaries or for unincorporated locations. When Broward County is the relevant permitting authority, its records and procedures may differ.
See our Broward County permit search guide for the separate county-level lookup process.
Town of Davie Building Division Address, Hours and Map
For questions about permit jurisdiction, application requirements, payments, reviews and inspections, the Town of Davie Building Division is the official point of contact.
Building Division
Town of Davie
8800 SW 36th Street
Building A
Davie, FL 33328
Phone: 954-797-1111
Fax: 954-797-1086
Published office hours:
Monday–Thursday
7:30 a.m.–5:30 p.m.
Confirm holiday closures, appointment requirements and the service you need before visiting.
Office location
Map for the Town of Davie municipal Building Division location. Confirm the correct building and any visitor instructions with the Town.
When should you contact the office?
Contact the Town when public records cannot resolve a permit-status question, the required permit category is unclear, a project needs unusual approvals, you have a payment dispute or a permit must be renewed or corrected.
For staff meetings, plan-review questions or specialist assistance, consult the official Building Division contact directory.
Frequently Asked Questions About Davie Permit Searches
1. How do I search for a building permit in Davie, Florida?
Open the Town’s official eSuite public search and enter a service address or complete permit number. Select the matching record to review available permit details and status.
2. Is the Town of Davie permit search free?
General public permit searches do not require a paid subscription or account. Separate records services, permit applications or document requests may carry applicable fees.
3. Can I search Davie permits without creating an account?
Yes. The official eSuite welcome page states that residents can conduct general permit searches without creating an account.
4. Where do I apply for a new Davie building permit in 2026?
Use the Town’s Online Application Submittal (OAS) system. OAS became the required submission method for new Building Division requests on January 12, 2026. ProjectDox is used for document and plan review.
5. Can homeowners apply as owner-builders?
Eligible property owners may be able to use Florida’s owner-builder provisions. The Town provides an Owner Builder Disclosure Statement. Review the applicable restrictions and application requirements before proceeding.
6. How long does Davie take to review permits?
The Town states it generally attempts to review applications within 30 working days, depending on complexity and workload. This is not a guarantee that every permit will be issued within that period.
7. How do I schedule a Davie building inspection?
Use an approved Town scheduling method such as OAS, authorized eSuite contractor access or the automated phone lines at 954-797-1128 and 954-797-1129. Phone requests require the relevant codes from the permit package.
8. What is the cutoff time for next-business-day inspections?
The Town publishes a 4:30 p.m. request cutoff. Weekend, Friday and Town-observed-holiday requests follow its special business-day processing rules. Confirm the scheduled date in the official system.
9. How do I find my inspection time?
Check eSuite after 8:00 a.m. on the inspection morning for an approximate time frame. To speak with an inspector, Davie directs callers to 954-797-1111 between 7:30 and 8:15 a.m.
10. Can I cancel an inspection on the inspection day?
The Town states that inspections cannot be canceled after 8:30 a.m. under its policy effective November 1, 2025, and late cancellations may result in charges. Contact the Town immediately if circumstances change.
11. How can I check whether a permit was completed?
Find the record in eSuite, examine its status and review available inspection details. For a formal determination about closeout or unresolved inspections, contact the Building Division.
12. What happens if my Davie permit expires?
You may need a renewal, extension or another Town-approved procedure. The available process depends on the permit’s status and circumstances. Official renewal and extension forms are available in the Building Forms directory.
13. Why does my eSuite permit fee differ from the final invoice?
Davie warns that pre-generated eSuite amounts can change as permits are processed. Rely on the Town’s official payment instructions and confirm any discrepancy before paying.
14. Are Davie and Broward County permits the same?
No. The Town of Davie and Broward County maintain distinct government functions and permitting processes. Confirm the property’s jurisdiction and the agency responsible for the work.
Official Town of Davie Permit Resources
The following official resources provide the underlying information for this guide. Use them to confirm current requirements and carry out your permit-related task.
Official OAS submission procedure, payment guidance, revisions, office details and inspection instructions.
Public permit records, service-address search, permit numbers and displayed permit status information.
Official application entry point referenced by the Town for new building permit requests.
Scheduling methods, request cutoffs, cancellation rules, inspector contact window and inspection results.
Official applications, disclosures, revisions, renewals, extensions and additional document forms.
Published permit, plan-review, inspection and associated fee information, subject to amendments.
Explains eSuite public inquiries, registered contractor access and inspection information.
What to Do Next
If you only need to verify an existing permit, begin with the official eSuite search and save the permit number for reference. If you are starting a project, consult the appropriate building forms and use OAS to initiate your request.
Before paying fees or starting construction, confirm the applicable permit conditions and current requirements directly with the Town. For unresolved questions, contact the Building Division at 954-797-1111.