City of Davie Permit Search: Status, Applications & Inspections 2026

Broward County, Florida • Town of Davie • 2026

Search Davie Building Permits, Check Status and Request Inspections

Looking up a building permit in Davie? Use the Town of Davie’s official eSuite portal to search records by street address or permit number. For a new application, use the separate Online Application Submittal (OAS) system introduced on January 12, 2026.

Independent research guide • Official Town of Davie resources linked throughout • The Town, not this website, issues permits and maintains permit records.
Public permit lookupeSuite — no account for general searches
New applicationsOAS, with ProjectDox document review
Inspection requestsBefore 4:30 p.m. for next-business-day scheduling
Building Division954-797-1111

Important 2026 change: An older permit guide may tell you to apply for a new Davie permit directly in eSuite. That instruction is outdated. Starting January 12, 2026, the Town designated OAS as the required method for new Building Division permit submissions and service requests. eSuite remains useful for public searches, permit status and authorized inspection scheduling.

Confirm the current process on the official Building Division page ↗

02 / TRACK THE RECORD

How to Check Davie Permit Application and Inspection Status

Searching for a permit and checking its status use the same public record system. An applicant may also receive review information through ProjectDox, which serves a different purpose from eSuite.

eSuite

Best for searching permit records by address or permit number, reviewing permit status and viewing available inspection information.

Open eSuite ↗

ProjectDox

Used for electronic plan and document review. Applicants receive instructions or invitations as part of the Town’s processing workflow.

Read ProjectDox instructions ↗

What common permit statuses mean

General interpretation of permit status terminology; the official record controls.
StatusWhat to check
Under review or pendingA review or administrative step may still be outstanding. Look for comments, required corrections or notifications.
Pending paymentConfirm the Town’s actual invoice before paying. An automatically displayed amount may not be final.
Permit issuedThe authorization has been issued. Check permit conditions and required inspections before beginning or continuing the relevant work.
Permit completedReview the underlying inspection and closeout records for the specific work involved.
Expired or otherwise inactiveAsk the Town whether renewal, an extension or another corrective process is available before work continues.

These explanations help you interpret common records; they are not an exhaustive official status-code directory. A review comment, payment issue or missing inspection can change what action is needed.

Checking a permit for a home purchase

If you are buying a Davie property, search for significant additions, reroofing, electrical upgrades, air-conditioning replacements and other work that may have required permits. Keep the permit numbers and statuses for discussion with your inspector, seller or closing professional.

A public permit search does not establish that every improvement was permitted, nor does it replace a property inspection or a formal records request. Records may be incomplete or stored across different systems.

03 / NEW SUBMISSIONS

How to Apply for a New Town of Davie Building Permit in 2026

Davie’s current application process starts in the Online Application Submittal (OAS) portal. This is a significant distinction for anyone following an older guide that directs all new applications to eSuite.

1

Determine the permit category

Identify whether the project involves building/structural, electrical, plumbing, mechanical, roofing or a combination of disciplines. A larger project may require multiple associated permits and reviews.

2

Prepare the required application

Use the current Town building permit application and project-specific checklist. Confirm the property address, scope of work, estimated construction value and applicant information.

3

Submit a request through OAS

Open OAS and follow the applicable Building Permit request instructions. Be accurate with the email address: it is important for receiving later document-upload and processing instructions.

4

Watch for the ProjectDox invitation

The Town explains that applicants receive an email inviting them to upload plans and documents through ProjectDox. Check the spam folder if the message does not appear.

5

Upload plans in the required format

Follow the Town’s file naming, document type and project checklist rules. Upload missing materials or corrected plans when requested. A successful initial request does not necessarily mean plan review has begun.

6

Respond to reviews and pay verified charges

Monitor the review process and respond to correction requests. The Town says applications with a job value of $100,000 or more require an application/drop-off fee before routing to review. Wait for official payment instructions where required.

7

Obtain the issued permit and follow conditions

After approval and payment processing, access the approved documents and permit information provided by the Town. Schedule the required inspections at the correct construction stages.

Paper and email submission warning: The Town states that its new OAS process replaces ordinary paper permit submissions and direct emails to individual employees. It separately describes limited in-person and legacy-paper-permit procedures. Follow the current Building Division instructions for your specific situation rather than assuming a mailed or emailed application will be accepted.

Owner-builder applications

Florida has owner-builder provisions, but they are not a blanket exemption from licensing, safety or permitting rules. Applicants using this route should review the Town’s Owner Builder Disclosure Statement and confirm whether their property and proposed work qualify.

The Town notes that when an owner-builder permit application is handled in person, the owner-builder must personally bring the application. Do not assume a contractor’s standard application procedure applies unchanged.

Find the Owner Builder Disclosure Statement and Building Permit Application ↗

Corrections and revisions

For applications handled through the newer system, request revisions through OAS and upload the required documents and revised plans through the resulting workflow.

For permits originally submitted on paper, Davie publishes a separate legacy procedure that may require a revision form and two sets of plans delivered to the Building Division. Verify the applicable process before submitting.

04 / APPLICATION READINESS

Documents to Prepare Before Applying for a Davie Permit

The documents required depend on the type of work, its location and whether the applicant is a licensed contractor or qualifying owner-builder. A roof replacement does not require the same plans as an addition, and commercial construction may involve additional professional design and agency reviews.

Practical pre-submission checklist

  • Correct property address and owner information.
  • Completed Town building permit application and applicable addendum.
  • Accurate description and construction value of the work.
  • Contractor license and applicant details, where applicable.
  • Owner-builder disclosure, if applying under that provision.
  • Current survey or acceptable survey documentation when required.
  • Site plan showing proposed work, dimensions and setbacks when applicable.
  • Construction drawings or signed/sealed plans where required.
  • Product approvals, engineering information and discipline-specific documents when applicable.
  • Notice of Commencement or other required recorded documents when applicable.
  • Any required zoning, engineering, landscaping or floodplain information.

This is a planning checklist, not a substitute for the exact Town checklist associated with your permit type.

Official forms worth checking

Davie’s Building Forms directory contains the Building Permit Application, Addendum, Owner Builder Disclosure Statement, Revision/Shop Drawings materials, permit extension and renewal requests, Notice of Commencement and ProjectDox instructions.

Using the official forms directory is safer than downloading an old application from an unrelated website, especially after the January 2026 submission change.

Browse current Town of Davie building forms ↗

How to find your parcel or ownership information

The Broward County Property Appraiser provides property record information that may help confirm an owner name, folio/parcel identifier or situs address.

Property appraiser information is not a substitute for the Town’s permit records. Use each system for its intended purpose.

05 / PROJECT TYPES

Common Building Permits: Roofing, Fences, Remodeling and More

Davie projects are reviewed based on their actual scope, applicable building codes and local land-development requirements. These examples help identify which questions to ask before submitting a permit.

Common project categories and typical documentation considerations.
ProjectWhat to check before applying
Roof replacementRoof type, applicable product approvals, contractor details and any required roof assembly documentation.
Fence installationFence height, location, setbacks, property boundaries, easements and relevant zoning/engineering review.
Residential additionSurvey, site plan, structural drawings, building setbacks and associated electrical, plumbing or mechanical work.
Electrical upgradesScope of circuit or service work, equipment information and contractor licensing requirements.
Plumbing changesFixture locations, piping changes, equipment specifications and applicable inspections.
HVAC replacementEquipment sizing/details, mechanical requirements, related electrical work and any required product documentation.
Swimming poolSurvey, pool plans, barriers, electrical work, setbacks and applicable engineering/zoning requirements.
Commercial alterationsOccupancy/use, accessibility, life safety, fire review and professionally prepared plans when required.

Davie fence permits

A fence project can raise questions beyond construction materials. Its location relative to property lines, utility easements, drainage, roads and required setbacks can affect approval.

Start with the property’s survey and a clearly identified proposed fence location. Consult the Town’s applicable permit and engineering checklists, including its pool and fence information where relevant.

See Davie Engineering permit information and checklists ↗

Davie roofing permits

Roofing work often requires material specifications and applicable product approval information. A complete application should identify the work proposed and the contractor responsible where licensing is required.

The Town also publishes an important roofing-inspection safety instruction: an OSHA-approved ladder must be set up and secured to the roof on the inspection day so the inspector can access the work.

Do not assume every reroof qualifies for expedited review or a fixed processing time. Follow the specific roofing requirements given by the Building Division.

Check contractor licensing

Before hiring a contractor or relying on someone to obtain permits, verify licensing through Florida’s Department of Business and Professional Regulation (DBPR), as applicable to the trade.

Check that the business or individual details match and that the license category is appropriate for the proposed work. A permit status search alone is not a contractor license check.

Visit Florida’s official DBPR licensing website ↗

06 / COSTS & REVIEW

Davie Building Permit Fees, Payments and Review Times

Permit fees depend on the project, construction value, disciplines involved and any applicable review charges or surcharges. A single flat price cannot accurately represent every Davie permit.

Where to find the official fee schedule

The Town provides a Building Permit Fee Schedule, including permit fees, plan review, inspections and other applicable charges. The published schedule identifies modifications effective October 1, 2025. Confirm whether a newer schedule or amendment applies before submitting payment.

Do not pay solely from the eSuite estimate

Davie specifically cautions applicants that amounts automatically shown in eSuite may change during processing. The Town sends an invoice with the actual payment instructions.

Depending on the available payment method, applicants may have options such as online card payment, telephone payment, check or ACH transfer. The Town states that payment processing can take one to three business days, after which the permit card, permit and receipt are made available in the approved ProjectDox folder.

For master permits and associated subpermits, verify payment sequencing and any outstanding charges with the Town.

How long does approval take?

The Town’s published FAQ says it generally attempts to review permit applications within 30 working days, depending on complexity and workload. That is not a guaranteed issuance date.

Corrections, incomplete submissions, additional disciplines and outside-agency approvals may affect the overall timeline. A project should not begin permit-required work simply because an application has been submitted.

Read the Town’s permitting FAQ ↗

07 / FIELD INSPECTIONS

How to Schedule and Check Davie Permit Inspections

Required inspections verify work at specified construction stages. The exact sequence depends on the project and permit conditions. Davie provides online and telephone scheduling options.

Online inspection request

The Town lists OAS as an inspection-request option. Registered contractors may also use eSuite for scheduling and reviewing inspections.

Official inspection instructions ↗

Automated phone scheduling

Call 954-797-1128 or 954-797-1129. You need the phone access code and inspection code from the permit package.

The Town notes these codes are on the inspection sheet, not the permit card.

Official inspection scheduling rules

4:30 p.m. cutoff: Inspection requests received before 4:30 p.m. are added to the next-business-day schedule. Requests received on Friday, Saturday, Sunday or a Town-observed holiday are shifted according to the Town’s published business-day procedure.

For example, a request received during a weekend may be treated as received on the following business day, with the inspection scheduled for the business day after that. Confirm the actual scheduled date rather than relying on your originally requested date.

Find your approximate inspection time

Check eSuite after 8:00 a.m. on the morning of the inspection for an approximate time window.

If you need to speak with an inspector, the Town directs callers to 954-797-1111 between 7:30 and 8:15 a.m. that morning.

Inspection cancellation warning

Under the Town’s policy effective November 1, 2025, inspections cannot be canceled after 8:30 a.m. through the ordinary process. A late attempted cancellation may result in additional fees.

If site conditions change, contact the Building Division as early as possible.

Prepare the job site before an inspection

  • Confirm the permit and specific inspection requested.
  • Ensure the applicable work is ready for inspection.
  • Have required approved plans and permit documents available.
  • Provide safe access to the relevant work area.
  • Follow special access or safety instructions, including the roofing ladder requirement when applicable.
  • Check the inspection result and respond to any corrections before requesting reinspection.

For a project involving rough-in work, do not cover elements that need inspection before the relevant inspection occurs.

Where to view inspection results

Use the eSuite permit record and enter the complete permit number or service address. Review the available inspection entries to identify the inspection stage and reported outcome.

Check permit and inspection records in eSuite ↗

08 / KEEP THE PERMIT VALID

Davie Permit Expiration, Renewal and Extensions

Permit issuance is not indefinite permission to leave a project inactive. Davie’s Building Division publishes expiration and renewal guidance tied to Broward County’s administrative provisions of the Florida Building Code.

The Town’s guidance states that an issued permit may become void if authorized work does not commence within 180 days, or if work is suspended or abandoned for 90 days after commencement. The Town also explains inspection inactivity in its permit-validity FAQ.

Actual expiration and renewal eligibility depend on the governing rules and the record. If a permit is approaching expiration or is already inactive, contact the Town before continuing construction.

What to do if your permit expired

  1. Look up the permit using its complete number.
  2. Check the last known status, inspection and issue dates.
  3. Review the Town’s Permit Renewal Request or Permit Extension Request form, as appropriate.
  4. Contact the Building Division if the correct procedure is unclear.
  5. Submit the required request through the Town’s current process and wait for its decision.

Renewal or extension is not automatic. Additional fees or other conditions may apply.

Find permit renewal and extension forms ↗

09 / SOLVE COMMON ISSUES

What to Do When a Davie Permit Search or Application Does Not Work

Practical troubleshooting for public searches and permit applications.
ProblemRecommended next action
No permits found for the addressCheck spelling, street direction and address selection. Try the full permit number or ask the Town about historical records.
Permit number not recognizedEnter the complete number with its original hyphenation and digits.
New application option missing in eSuiteUse the current OAS portal rather than treating eSuite as the new-application starting point.
No ProjectDox invitation receivedCheck email and spam folders, confirm the address supplied in OAS and contact the Building Division.
Plans returned for correctionsRead the relevant review comments, update all affected documents and follow the correction workflow.
Payment amount looks incorrectWait for or confirm the official Town invoice; do not assume eSuite’s displayed estimate is final.
Inspection not on scheduleCheck the 4:30 p.m. cutoff, weekend/holiday processing and whether the request was complete.
Permit is expiredAsk about renewal or extension and review the official request forms before work proceeds.

How to request historical or additional records

If eSuite does not show everything needed for a property transaction, insurance matter or compliance review, ask the Building Division whether another Town records system or formal records request is appropriate.

The Town’s Building Forms directory includes a Records Request Form. Describe the property address, relevant date range and type of document as precisely as possible.

City or county jurisdiction?

Davie is a town in Broward County. A property with a Davie mailing address should not automatically be assumed to fall under Town of Davie permitting jurisdiction.

Confirm the property’s actual municipal jurisdiction, particularly near boundaries or for unincorporated locations. When Broward County is the relevant permitting authority, its records and procedures may differ.

See our Broward County permit search guide for the separate county-level lookup process.

10 / OFFICIAL CONTACT

Town of Davie Building Division Address, Hours and Map

For questions about permit jurisdiction, application requirements, payments, reviews and inspections, the Town of Davie Building Division is the official point of contact.

Building Division

Town of Davie

8800 SW 36th Street
Building A
Davie, FL 33328

Phone: 954-797-1111

Fax: 954-797-1086

Published office hours:
Monday–Thursday
7:30 a.m.–5:30 p.m.

Confirm holiday closures, appointment requirements and the service you need before visiting.

Official Building Division website ↗

Office location

Map for the Town of Davie municipal Building Division location. Confirm the correct building and any visitor instructions with the Town.

Open directions in Google Maps ↗

When should you contact the office?

Contact the Town when public records cannot resolve a permit-status question, the required permit category is unclear, a project needs unusual approvals, you have a payment dispute or a permit must be renewed or corrected.

For staff meetings, plan-review questions or specialist assistance, consult the official Building Division contact directory.

11 / QUICK ANSWERS

Frequently Asked Questions About Davie Permit Searches

1. How do I search for a building permit in Davie, Florida?

Open the Town’s official eSuite public search and enter a service address or complete permit number. Select the matching record to review available permit details and status.

2. Is the Town of Davie permit search free?

General public permit searches do not require a paid subscription or account. Separate records services, permit applications or document requests may carry applicable fees.

3. Can I search Davie permits without creating an account?

Yes. The official eSuite welcome page states that residents can conduct general permit searches without creating an account.

4. Where do I apply for a new Davie building permit in 2026?

Use the Town’s Online Application Submittal (OAS) system. OAS became the required submission method for new Building Division requests on January 12, 2026. ProjectDox is used for document and plan review.

5. Can homeowners apply as owner-builders?

Eligible property owners may be able to use Florida’s owner-builder provisions. The Town provides an Owner Builder Disclosure Statement. Review the applicable restrictions and application requirements before proceeding.

6. How long does Davie take to review permits?

The Town states it generally attempts to review applications within 30 working days, depending on complexity and workload. This is not a guarantee that every permit will be issued within that period.

7. How do I schedule a Davie building inspection?

Use an approved Town scheduling method such as OAS, authorized eSuite contractor access or the automated phone lines at 954-797-1128 and 954-797-1129. Phone requests require the relevant codes from the permit package.

8. What is the cutoff time for next-business-day inspections?

The Town publishes a 4:30 p.m. request cutoff. Weekend, Friday and Town-observed-holiday requests follow its special business-day processing rules. Confirm the scheduled date in the official system.

9. How do I find my inspection time?

Check eSuite after 8:00 a.m. on the inspection morning for an approximate time frame. To speak with an inspector, Davie directs callers to 954-797-1111 between 7:30 and 8:15 a.m.

10. Can I cancel an inspection on the inspection day?

The Town states that inspections cannot be canceled after 8:30 a.m. under its policy effective November 1, 2025, and late cancellations may result in charges. Contact the Town immediately if circumstances change.

11. How can I check whether a permit was completed?

Find the record in eSuite, examine its status and review available inspection details. For a formal determination about closeout or unresolved inspections, contact the Building Division.

12. What happens if my Davie permit expires?

You may need a renewal, extension or another Town-approved procedure. The available process depends on the permit’s status and circumstances. Official renewal and extension forms are available in the Building Forms directory.

13. Why does my eSuite permit fee differ from the final invoice?

Davie warns that pre-generated eSuite amounts can change as permits are processed. Rely on the Town’s official payment instructions and confirm any discrepancy before paying.

14. Are Davie and Broward County permits the same?

No. The Town of Davie and Broward County maintain distinct government functions and permitting processes. Confirm the property’s jurisdiction and the agency responsible for the work.

12 / PRIMARY SOURCES

Official Town of Davie Permit Resources

The following official resources provide the underlying information for this guide. Use them to confirm current requirements and carry out your permit-related task.

Town of Davie Building Division ↗

Official OAS submission procedure, payment guidance, revisions, office details and inspection instructions.

Davie eSuite Public Permit Search ↗

Public permit records, service-address search, permit numbers and displayed permit status information.

Davie Online Application Submittal (OAS) ↗

Official application entry point referenced by the Town for new building permit requests.

Town of Davie Inspections ↗

Scheduling methods, request cutoffs, cancellation rules, inspector contact window and inspection results.

Building Forms and ProjectDox Resources ↗

Official applications, disclosures, revisions, renewals, extensions and additional document forms.

Town of Davie Building Permit Fee Schedule ↗

Published permit, plan-review, inspection and associated fee information, subject to amendments.

Town of Davie Online Self Service ↗

Explains eSuite public inquiries, registered contractor access and inspection information.

What to Do Next

If you only need to verify an existing permit, begin with the official eSuite search and save the permit number for reference. If you are starting a project, consult the appropriate building forms and use OAS to initiate your request.

Before paying fees or starting construction, confirm the applicable permit conditions and current requirements directly with the Town. For unresolved questions, contact the Building Division at 954-797-1111.

County Permit Smart Tools

Find the Right Permit, Prepare Documents, Plan Inspections & Avoid Permit Mistakes

Use these quick permit tools to understand which permit may apply, how to search permit records, what documents to prepare, which inspections may happen, and which local department usually handles your issue.

Built for permit users Helpful for building permits, remodels, roofing, electrical, plumbing, fences, pools, decks, zoning, and inspection planning.
Educational guidance only Permit rules, fees, forms, inspections, and deadlines must be verified with the official county or city office.
Mobile friendly Designed for phones, tablets, and desktop screens without external scripts, jQuery, or extra plugins.

Permit Type Finder

Select your project type to see the likely permit category, common documents, possible inspections, and the office you may need to contact.

Commercial and rental projects may need extra review, contractor details, or inspections.
Result copied.

Permit Search Method Helper

Search portals work differently by county or city. Choose what information you have and this tool will suggest the best way to search permit records.

Use this to create simple search variations if needed.
Tips copied.

Permit Application Readiness Checklist

Use this checklist before applying online or visiting the building department. Missing documents are one of the most common reasons permit applications are delayed.

Tip: Save PDFs, drawings, contractor licence proof, emails, and receipts in one folder before applying. It makes resubmission and inspection scheduling easier.

Permit Inspection Stage Planner

Select your project type to see common inspection stages and what to prepare before requesting an inspection.

Plan copied.

Correct Department Finder

Select the issue and this tool will show the department that usually handles it. Local names may vary by county or city.

Select an option above to see the usual department.

Unpermitted Work Risk Checker

If work was already done without a permit, use this tool to understand the risk level and next steps before ignoring the issue.

Result copied.