Colorado Right-of-Way Permit Search: Street Work & Excavation Records

Colorado public works records • 2026

Find Colorado Right-of-Way Permits, Street Cut Records & Excavation Status

A Colorado right-of-way permit search starts with one question: who controls the road, sidewalk, alley, shoulder or highway where the work occurred? State highways are generally handled through the Colorado Department of Transportation, while cities and counties maintain their own right-of-way, street occupancy, utility, excavation and public-improvement records.

Quick answer There is no practical single search path for every Colorado right-of-way record. Identify the road-owning jurisdiction first, then use that agency’s permit portal. Denver and Fort Collins provide public ROW or engineering searches, Boulder County has a Public Works records portal, and other counties may route permit research through an engineering office or records request.
Independent guide: CountyPermitSearch.org is not a Colorado state, county or municipal agency and does not issue right-of-way permits. Use the linked government systems for official records, applications, fees, inspections and permit decisions.

How Colorado Right-of-Way Permit Searches Work

Right-of-way records are different from ordinary building permits. A building department usually regulates work on a structure or property. A right-of-way authority regulates activity within public transportation space such as streets, alleys, sidewalks, shoulders, medians, drainage areas and utility corridors.

That distinction matters because a building permit search can return no useful information about a street excavation performed directly in front of the same property. The ROW permit may be stored by a transportation, public works, engineering or infrastructure department instead.

Best information to have before searching

  • Exact work-site address or nearest street intersection.
  • Right-of-way permit, street cut or record number if available.
  • Approximate construction or excavation dates.
  • Contractor or utility company name.
  • Type of work, such as trenching, fiber installation, curb replacement or sidewalk closure.
  • Whether the road is a state highway, city street or county-maintained road.

If you are researching construction at a Colorado Springs-area property rather than street or ROW work, the record may belong in a building-permit system instead. See the verified PPRBD permit search guide for building and inspection records administered by the Pikes Peak Regional Building Department.

Identify the Road Jurisdiction Before Searching

The agency that owns or controls the right-of-way is usually the best starting point. Entering the same address into an unrelated building portal can produce an empty result even when valid ROW permits exist elsewhere.

Where to start based on the roadway
Road or work area Likely authority Search approach
Colorado state highway right-of-way Colorado Department of Transportation Use CDOT Utility & Special Use resources and the appropriate regional permit coordinator.
Street, alley or sidewalk inside a city Municipal transportation, engineering or public works department Use the city’s ROW, engineering or public-improvement permit portal.
County road or unincorporated area County engineering, transportation or public works department Use the county’s permit portal, road information system or records custodian.
Private road or private easement Property owner, HOA or easement holder; public permits may still apply to connections Verify ownership and then check public approvals for any connection to public ROW.

State highway versus local road

CDOT’s Utility & Special Use Program manages utility installations and other qualifying work in state highway right-of-way. Its permit process is regional, so applicants and researchers may need to identify the appropriate CDOT region rather than treating Colorado as one local permitting jurisdiction.

Local streets are different. Denver, Fort Collins, Boulder County, Larimer County, Jefferson County and other jurisdictions maintain their own procedures. A project can also involve more than one approval when work affects both a local project and state-controlled highway infrastructure.

Do not rely on the mailing city alone. A property can have a familiar city mailing address while the adjacent roadway is maintained by a county, CDOT or another jurisdiction. Confirm road ownership when the search result does not match the location.

Colorado Right-of-Way Permit Search Portals

The resources below are useful starting points for some of Colorado’s larger jurisdictions. Search capabilities differ. Some systems expose public permit details directly, while others primarily provide applications, permit guidance and agency contacts.

Official right-of-way and engineering permit resources
Jurisdiction Official resource Useful search information
Colorado / state highways CDOT Utility & Special Use Program State-highway ROW permitting, online application access and regional utility permit contacts.
Denver Denver Right-of-Way ePermits Search Search by record number, project name, project address, contractor information and available record types.
Fort Collins Fort Collins Engineering Permit Search Engineering records including excavation permits; official portal notes excavation permits from 2019 forward can be searched.
Boulder County Boulder County Public Works Search Search Public Works records using record, address, parcel and related criteria available in the portal.
Larimer County Larimer County ROW Construction Permits Online portal access for utility ROW construction permits plus application and engineering requirements.
Jefferson County Jefferson County ROW Use & Construction Permit rules, application documents, mapping guidance and Transportation & Engineering contact information.

These examples are not a complete list of every Colorado city, town, county or special district. For a location not shown here, search the official jurisdiction website for terms such as right-of-way permit, street cut permit, excavation permit, utility permit, street occupancy or public improvement permit.

What a Right-of-Way Permit Record Can Tell You

The exact fields vary by agency and permit type. A public search may show only a basic record, while the underlying government file can contain plans, insurance documents, traffic-control information, inspection notes, correspondence and restoration requirements.

Common ROW record fields and how to use them
Record field What it helps confirm What to check next
Permit or record number The specific government record tied to the project. Use it for follow-up searches, inspection questions and records requests.
Work location Whether the permit applies to the street segment you are researching. Compare street direction, block, intersection and parcel context.
Permit type Whether the authorization covers excavation, street occupancy, utility work, construction or another ROW activity. Look for related approvals if the project involved more than one activity.
Applicant or contractor The company or person associated with the permit. Verify that the name matches project paperwork or the utility performing the work.
Status Where the permit appears to be in the agency’s workflow. Review inspection, expiration, closure and correction information instead of reading the status alone.
Dates When the record was created and, where provided, permitted work or review periods. Distinguish application, issue, work, inspection and closure dates.
Attachments Additional project details when documents are available publicly. Look for approved plans, conditions, traffic-control documents and inspection information.

An issued permit is not the same as completed work

Permit issuance generally means the agency authorized work subject to applicable conditions. It does not by itself establish that construction was completed, restoration was accepted or every required inspection occurred.

For property due diligence, utility disputes or street-restoration questions, look for the latest available inspection or closure information. If the portal does not expose those details, contact the issuing authority with the permit number.

Street Cut, Excavation, Utility and ROW Permits Are Not Always the Same

Colorado agencies use different names for related right-of-way activities. Searching only one phrase can cause you to miss the record you need.

Street cut

Street Cut Permit

Typically relates to cutting, boring, coring, sawing or otherwise disturbing a paved or improved public surface that must later be restored.

Temporary use

Street Occupancy Permit

Commonly covers temporary occupation or closure of a street, sidewalk, parking area or other public right-of-way for construction or equipment.

Construction

ROW Construction Permit

Can apply to improvements such as sidewalks, curb and gutter, paving, pedestrian facilities, drainage features and other work within the public corridor.

Utilities

Utility or Special Use Permit

May cover installation, relocation or maintenance of water, sewer, electric, gas, telecommunications, fiber or other infrastructure in public ROW.

Property access

Access or Driveway Permit

Often governs a new or modified connection between private property and a public road. On a state highway, CDOT identifies access permits separately from utility and special-use permits.

Private improvement

Encroachment Permit

Can apply when a privately owned improvement occupies or extends into public right-of-way. Requirements vary substantially by jurisdiction and project.

Search more than one record type when the project is complex. A utility excavation may involve a utility permit, street cut authorization, traffic-control approval and temporary occupancy of the ROW. One record should not automatically be treated as the entire project file.

No Colorado Right-of-Way Permit Found? Try These Checks

A blank online search result does not prove that work was unpermitted. The record may be stored under a different agency, permit type, address format, contractor name, historical system or paper file.

Common search problems and practical next steps
Problem What may be happening Next step
No address match The permit uses an intersection, block range, project name or different street formatting. Try street name only, nearby cross streets, contractor or record number.
Building permits appear but no ROW record You are searching the building module instead of engineering or ROW records. Switch to the transportation, public works or engineering search.
City portal has nothing The road may be county-maintained or part of the state highway system. Verify roadway jurisdiction before searching again.
Only recent records appear Older permits may predate the current online system. Ask the agency about archived or legacy records.
Permit summary lacks plans Attachments may not be publicly downloadable from the search interface. Request the specific underlying documents from the records custodian.
Status appears unresolved Inspection, restoration or administrative closure activity may not be obvious from the summary. Use the permit number when contacting the issuing engineering or ROW office.

Search by contractor or utility when possible

Linear street work may span multiple addresses, which makes property-only searching less reliable. Denver and Fort Collins provide contractor-related search fields in their public systems. If you know the utility, excavation contractor or project name, use that information to narrow the record set.

Check older records separately

A public portal’s current date range is not necessarily the beginning of the agency’s permit history. Fort Collins specifically identifies searchable excavation permits from 2019 to the present in its Engineering portal. For earlier work, ask the city whether another archive or records-request process applies.

Right-of-Way Permits Do Not Replace Colorado 811 Requirements

A government excavation or ROW permit and an underground utility locate are separate requirements. Colorado 811 states that excavators must request underground-facility information before excavation and must review the required responses before digging.

Before excavation begins

  • Obtain the required government ROW, street cut or excavation authorization.
  • Submit the required Colorado 811 locate request for the planned excavation.
  • Allow the current required notice period to run.
  • Review positive responses from affected utility operators.
  • Confirm required markings or all-clear responses before excavation.
  • Use appropriate care around marked facilities and follow the permit’s traffic and restoration conditions.

Current notice timing and ticket procedures should be verified directly with Colorado 811 before work begins because operational guidance can change.

Colorado 811 also explains that public utility locates do not identify every privately owned underground facility. Private lines may require a separate private locating service.

Use a CORA Request When the Permit File Is Not Online

Colorado’s Open Records Act provides a framework for access to public records maintained by state and local government entities, subject to statutory restrictions and exemptions. The key practical point is that the request should go to the government entity that actually maintains the ROW record.

Official Colorado guidance explains that responsive public records are generally required to be made available within three working days, with an additional seven working days possible when qualifying extenuating circumstances exist. That does not mean every request will produce every document: exemptions, custodian rules, record availability and lawful redactions still apply.

What to include in a focused ROW records request

  • The exact street address, intersection or roadway segment.
  • An approximate date range for the work.
  • The permit or record number when known.
  • The contractor, utility or project name when known.
  • The specific records you want, such as the permit application, issued permit, approved plans, traffic-control plan, inspection records or closure documentation.

A focused request is usually easier for a custodian to identify than a broad demand for every document related to a street or neighborhood.

CORA is a records-access process, not a requirement that an agency create a new report or provide a legal interpretation of the records. If the documents raise a question about current permit validity or whether work may proceed, ask the responsible ROW or engineering office separately.

For a general explanation of Colorado Open Records Act procedures, review the state’s CORA information, then use the records policy of the specific city, county or state agency holding the permit file.

How Major Colorado Jurisdictions Handle ROW Records

Denver: dedicated Right-of-Way permit search

Denver provides a dedicated ROW module in its ePermits system. The public search supports record number, project name, project address and licensed-contractor information. This makes it one of the clearest starting points for street occupancy, utility and other ROW research within the City and County of Denver.

Denver’s Right-of-Way Services FAQ distinguishes several permit categories. A Street Occupancy Permit is associated with work in or occupation of the ROW, while a Street Cut Permit addresses disturbance of ROW surfaces that require restoration. The city also identifies ROW Construction Permits for specified construction within the public corridor.

Fort Collins: engineering and excavation permit records

Fort Collins maintains an Engineering search inside its Citizen Access portal. The city states that excavation permits from 2019 to the present may be searched by permit number, address, contractor information and other available filters.

Use the Engineering tab rather than assuming the same record will appear under building permits. This distinction is especially important when researching trenching, utility cuts or street construction that did not involve structural building work.

Boulder County: Public Works and right-of-way resources

Boulder County maintains a Public Works permit search with fields for record information, address and parcel information. The county also publishes separate guidance explaining that public right-of-way accommodates traffic, utilities, drainage and similar public uses.

Permit type matters in Boulder County. The county distinguishes roadway construction, access, utility and other transportation-related approvals. Choose the record category that matches the actual work rather than assuming every activity is filed under a generic ROW label.

Larimer County: utility work in county rights-of-way

Larimer County Engineering regulates installation of utilities within county rights-of-way and provides an online portal for permit activity. Its current guidance lists a 10-business-day review period once all required documentation has been submitted for a Right-of-Way Construction permit.

The county also identifies project documentation such as plans, emergency contact information, insurance and a traffic control plan where applicable. Current requirements and fees should always be checked on the county’s official page before applying.

Jefferson County: ROW use and construction permits

Jefferson County requires a Right-of-Way Use and Construction Permit for qualifying work in county right-of-way or easements. Its current permit page also provides mapping guidance for checking county roadway information and directs applicants to Transportation and Engineering.

If the online material does not contain the historical permit file you need, use the responsible county office or records process rather than assuming the absence of a public search result means that no permit was issued.

Using ROW Records for Property Due Diligence

Right-of-way records can help explain recent utility trenches, reconstructed sidewalks, driveway work, curb replacement and other activity near a property. They can also help property owners identify who performed work and what permit number to reference when pavement or landscaping restoration becomes a concern.

Home buyers and property owners

  • Compare visible street or sidewalk work with the permit’s location and scope.
  • Determine whether the project affected a driveway, curb, sidewalk or utility connection serving the property.
  • Check available inspection or closure information when restoration quality is important.
  • Search building permits separately for structural work on the property itself.
  • Ask the issuing agency when a permit status or project boundary is unclear.

Contractors and utility companies

  • Confirm that the correct road-owning agency has jurisdiction.
  • Verify the exact permit category before submitting an application.
  • Keep the permit or record number tied to field documentation.
  • Check traffic-control, inspection and restoration requirements before mobilizing.
  • Coordinate required underground-utility locating independently from the permit application.

What a permit search cannot prove

A permit database is not a complete legal or engineering assessment of a property. It may not show every historical record, privately owned utility, easement, unpermitted activity or separate approval issued by another government office.

Likewise, finding one closed ROW permit does not prove that every nearby improvement was covered by that permit. Match the permit’s scope, dates and location to the specific issue you are researching.

Colorado Right-of-Way Permit Search FAQs

Is there one statewide Colorado right-of-way permit search?

Right-of-way permitting is jurisdiction-specific. CDOT manages qualifying work within state highway right-of-way, while cities and counties maintain their own ROW, engineering, street cut and public works records. Start by identifying which agency controls the road.

How do I search Denver right-of-way permits?

Use Denver’s official ePermits Right-of-Way module. The public search supports record number, project name, project address and licensed-contractor information. Select the appropriate record type when the system requires it.

Can I search Colorado ROW permits by address?

Many local portals support address-based searching, including Denver, Fort Collins and Boulder County systems. Address search is not universal, and linear road projects may be stored by intersection, project name or permit number instead.

Can I search using a contractor or utility company name?

Some systems allow contractor-related searches. Denver and Fort Collins provide contractor fields in their public permit interfaces. This can be useful when the street project spans more than one address.

What is the difference between a street cut permit and a ROW permit?

Terminology differs by agency. A street cut permit generally concerns physical disturbance of a street or other improved ROW surface, while ROW permits can cover a broader range of activities such as temporary occupancy, construction, utilities, access or encroachments.

Does a right-of-way permit include a Colorado 811 locate?

No. A ROW permit and an underground utility locate serve different purposes. Excavators should follow current Colorado 811 requirements separately and confirm required utility responses before beginning excavation.

Why can I find a building permit but not the street excavation permit?

The records may be managed by different departments. Building permits are commonly handled by a building or development office, while street excavation is often handled by transportation, engineering or public works.

What should I do if an old excavation permit is not online?

Confirm the jurisdiction, ask whether the agency has a legacy or archived permit system, and submit a focused records request if necessary. Provide the work location, approximate dates and any known contractor or permit number.

Can I use CORA to request a Colorado ROW permit file?

Public government records may be requested under Colorado’s Open Records Act subject to applicable exemptions and custodian procedures. Send the request to the agency that maintains the specific permit record rather than to an unrelated state office.

Does a closed right-of-way permit prove the street work was done correctly?

A closed record is useful evidence of the agency’s permit workflow, but it should not be treated as a universal guarantee about every condition at the site. Review the permit scope and available inspection or restoration information for the specific work being investigated.

Where should I search for right-of-way work on a Colorado state highway?

Begin with CDOT’s Utility & Special Use Program and permit-process resources. CDOT uses regional permit contacts for state-highway ROW work, so identify the appropriate region for the project location.

Can a project require both local and CDOT approvals?

Yes, depending on project scope and jurisdiction. Work affecting a state highway may involve CDOT authorization while other parts of a project remain subject to city, county, utility, development or building requirements.

Official Colorado Right-of-Way Resources

Permit systems, fees, forms, record availability and agency procedures can change. Use the government resources below to verify consequential information before excavation, construction, property closing or compliance decisions.

Colorado Department of Transportation — Utility & Special Use Program CDOT utility and special-use permit information
Colorado Department of Transportation — Permit Process CDOT ROW utility and special-use permit process
City and County of Denver — Right-of-Way ePermits Search Denver ROW permit records
City and County of Denver — Right-of-Way Services FAQ Review Denver street occupancy, street cut and ROW guidance
City of Fort Collins — Engineering Permit Search Search Fort Collins engineering and excavation permits
Boulder County — Right-of-Way Information Review Boulder County ROW information
Larimer County — Right-of-Way Construction Permit Review Larimer County utility ROW permits
Jefferson County — Right-of-Way Use and Construction Permit Review Jefferson County ROW permit requirements
State of Colorado — CORA Information Review Colorado Open Records Act information

What to do next

If you already have a permit number, use the responsible jurisdiction’s official portal first. If you only have an address, determine who maintains the roadway and search its ROW or engineering records. When the record is not exposed online, contact that agency’s records custodian with a narrow request identifying the location, date range and documents needed.

For excavation that has not yet started, permit research is only one part of preparation. Verify current permit conditions, traffic-control requirements, inspection requirements and Colorado 811 obligations before disturbing the right-of-way.

Information reviewed October 22, 2026. Permit portals, contacts, fees, forms, search fields and procedures can change. Confirm current requirements directly with the agency responsible for the specific road or right-of-way.

County Permit Smart Tools

Find the Right Permit, Prepare Documents, Plan Inspections & Avoid Permit Mistakes

Use these quick permit tools to understand which permit may apply, how to search permit records, what documents to prepare, which inspections may happen, and which local department usually handles your issue.

Built for permit users Helpful for building permits, remodels, roofing, electrical, plumbing, fences, pools, decks, zoning, and inspection planning.
Educational guidance only Permit rules, fees, forms, inspections, and deadlines must be verified with the official county or city office.
Mobile friendly Designed for phones, tablets, and desktop screens without external scripts, jQuery, or extra plugins.

Permit Type Finder

Select your project type to see the likely permit category, common documents, possible inspections, and the office you may need to contact.

Commercial and rental projects may need extra review, contractor details, or inspections.
Result copied.

Permit Search Method Helper

Search portals work differently by county or city. Choose what information you have and this tool will suggest the best way to search permit records.

Use this to create simple search variations if needed.
Tips copied.

Permit Application Readiness Checklist

Use this checklist before applying online or visiting the building department. Missing documents are one of the most common reasons permit applications are delayed.

Tip: Save PDFs, drawings, contractor licence proof, emails, and receipts in one folder before applying. It makes resubmission and inspection scheduling easier.

Permit Inspection Stage Planner

Select your project type to see common inspection stages and what to prepare before requesting an inspection.

Plan copied.

Correct Department Finder

Select the issue and this tool will show the department that usually handles it. Local names may vary by county or city.

Select an option above to see the usual department.

Unpermitted Work Risk Checker

If work was already done without a permit, use this tool to understand the risk level and next steps before ignoring the issue.

Result copied.